Tender Details

Particulars Details
Title
Strengthening Of 66 Kv Substation Hassanpur By Augmentation Of 66 Kv Single Bus Bar
Description
Strengthening Of 66 Kv Substation Hassanpur By Augmentation Of 66 Kv Single Bus Bar Of 0.4 Sq. Inch Acr Conductor To 66 Kv Double Bus Bar With 0.4 Sq. Inch Acsr Conductor Along With Extension Of 66 Kv Double Bus Bar With Creation Of 02 Nos. 66 Kv
Organisation Haryana Board Corporation | State Govt. and UT
Tender Id 2024_HBC_411908_1
Reference
Number
20245CB942D5 3E42 486D ACD0 E2ECFADCFA6A978HVP
Tender Fee 4720
EMD 94780
Tender Value -
Place Hassanpur
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=488468

Start Date November 19, 2024 19:30
End Date
Expired 26/11/2024

Expired 687 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of earth pits in sccl 132/33 kv substation, corporate

Construction of earth pits in sccl 132/33 kv substation, corporate

Read more
Contract for repair, replacement and restoration of 6.6 kv 1ba bus duct

Contract for repair, replacement and restoration of 6.6 kv 1ba bus ductof unit-1, vstps

Read more
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard

Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard

Read more
Construction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality

Construction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality

Read more
Operation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.

Operation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.

Read more
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.

Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.

Read more
Bifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-divi

Bifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-division in paradise division of secunderabad circle and the work executed by construction division of secunderabad circle under t and d improvements to original works reserved under sc category

Read more
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works

Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works

Read more
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.

Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.

Read more
Erection of new 33/11kv indoor substation with 1x12.5 mva ptr, connected 33kv and 11 kv lines, construction of control room and other civil works at sy. no 239,240,247 and 249, bahadurpally, dundigal-gandimaisamma (m), medchal-malkajgiri district in dummara pochampally(dp pally) section of shapur nagar sub-division in jeedimetla division of medchal operation circle, in master plan sub-division 1 of wcgh division of ranga reddy circle under t and d improvement works

Erection of new 33/11kv indoor substation with 1x12.5 mva ptr, connected 33kv and 11 kv lines, construction of control room and other civil works at sy. no 239,240,247 and 249, bahadurpally, dundigal-gandimaisamma (m), medchal-malkajgiri district in dummara pochampally(dp pally) section of shapur nagar sub-division in jeedimetla division of medchal operation circle, in master plan sub-division 1 of wcgh division of ranga reddy circle under t and d improvement works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise