Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Cd Works And Rcc Drain At 3.000 Km In The Pharmacy College Chowk To Bsnl Chowk Via Bandhposh, Pradhanpali, Tulsiltola In The Dist. Of Sundargarh For The Year 2025 26
|
Description |
Construction Of Cd Works And Rcc Drain At 3.000 Km In The Pharmacy College Chowk To Bsnl Chowk Via Bandhposh, Pradhanpali, Tulsiltola In The Dist. Of Sundargarh For The Year 2025 26
|
Organisation | EIC-CIVIL | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 6000 |
EMD | 50000 |
Tender Value | |
Place | Rourkela |
Link |
AAAAAAAAAA Login to view |
Start Date | June 01, 2025 00:00 |
End Date |
09/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreConstruction of rcc draintotal 8.06 km of nh-512 nh division vii
Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreof your Industry type