Tender Details

Particulars Details
Title
Installation Of Submarshal With Pucca House In Front Of D Haral Milan Sangha Club Part 44
Description
Installation Of Submarshal With Pucca House In Front Of D Haral Milan Sangha Club Part 44
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2025_ZPHD_946416_1
Reference
Number
BGP/670/25 SL 3
Tender Fee 250
EMD 2999
Tender Value
Place BEGAMPUR GP
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2256719

Start Date November 13, 2025 23:30
End Date
Expired 08/12/2025

Expired 205 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair and maint of mes installation in sector a, b, d under ge (a) no 1 in army area jodhpur.

Repair and maint of mes installation in sector a, b, d under ge (a) no 1 in army area jodhpur.

Read more
Construction of enclosed platform with fibre glass sculptures in mother children park in sector 44-c and park opposite market sector 51,chandigarh under ward development fund.

Construction of enclosed platform with fibre glass sculptures in mother children park in sector 44-c and park opposite market sector 51,chandigarh under ward development fund.

Read more
Under the mada scheme, a concrete interlocking road with drains is being constructed in the village of gumanpura, from jagdish meena house to laxman bairwa house in the gram panchayat simliya, sultanpur.

Under the mada scheme, a concrete interlocking road with drains is being constructed in the village of gumanpura, from jagdish meena house to laxman bairwa house in the gram panchayat simliya, sultanpur.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited

Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited

Read more
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Read more
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india

Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &amp#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &amp#x0d panchayat amethi distt lucknow up india

Read more
Installation of submarshal near milan sangha club

Installation of submarshal near milan sangha club

Read more
Installation of submarshal with pucca house in front of panchanan pandit house part 44

Installation of submarshal with pucca house in front of panchanan pandit house part 44

Read more
Construction of pucca drain from bankubihari shill house to milan sangha club

Construction of pucca drain from bankubihari shill house to milan sangha club

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise