Tender Details

Particulars Details
Title
Dismantling/Repairing, Cutting And Welding Of I Beam And Bed Plate Of 50 Ton Static Road Weighbridge Installed At Birsa Project.
Description
Dismantling/Repairing, Cutting And Welding Of I Beam And Bed Plate Of 50 Ton Static Road Weighbridge Installed At Birsa Project.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_334622_1
Reference
Number
PE(EnM)/Birsa/eTender/25-26/03
Tender Fee 0
EMD 3200
Tender Value
Place Birsa Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346880
Start Date April 27, 2025 14:30
End Date

06/05/2025 ( Expired 30 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Jungle and grass cutting of panchet earthen dam, nehru park, cleaning of dam road and day to day upkeepment of nehru park at dvc, panchet

Jungle and grass cutting of panchet earthen dam, nehru park, cleaning of dam road and day to day upkeepment of nehru park at dvc, panchet

Read more
Talegaon industrial area, ph i. widening of existing north and south side roads

Talegaon industrial area, ph i. widening of existing north and south side roads&amp#x0d to four lane road at plot of ms. hyundai at t.i.a. ph i&amp#x0d

Read more
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north

Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.

Read more
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.

(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.

Read more
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha

Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha

Read more
Cwe bly/ge(e)/05 of 25-26 spl repair to road in between cattle tri junction to gcrc till chaff cutter machine, , between shergali to chanmari and towards east block, between 30 acre plot to 50 acre plot puliya at manpur, shergali twoards thnadi sadak

Cwe bly/ge(e)/05 of 25-26 spl repair to road in between cattle tri junction to gcrc till chaff cutter machine, , between shergali to chanmari and towards east block, between 30 acre plot to 50 acre plot puliya at manpur, shergali twoards thnadi sadak

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise