Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling/Repairing, Cutting And Welding Of I Beam And Bed Plate Of 50 Te Static Road Weighbridge Installed At Birsa Project.
|
| Description |
Dismantling/Repairing, Cutting And Welding Of I Beam And Bed Plate Of 50 Te Static Road Weighbridge Installed At Birsa Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_331706_1 |
|
Reference Number |
PE(EnM)/Birsa/eTender/24-25/27 |
| Tender Fee | 0 |
| EMD | 3300 |
| Tender Value | - |
| Place | Birsa Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343850 |
| Start Date | March 08, 2025 21:30 |
| End Date |
Expired
15/03/2025
Expired 577 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of 50 te asec make electronic road weighbridge installed at kathara washery along with conduiting of all 06 nos. load cells
Repairing of 50 te asec make electronic road weighbridge installed at kathara washery along with conduiting of all 06 nos. load cells
Read moreSupply, replacement and fitting of junction box card and 50/60 te. load cell of pragati make road weighbridge (rd 1601) of capacity 50 te. installed at tarmi siding of sdocm project of dhori area.
Supply, replacement and fitting of junction box card and 50/60 te. load cell of pragati make road weighbridge (rd 1601) of capacity 50 te. installed at tarmi siding of sdocm project of dhori area.
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreDismantling/repairing, cutting and welding of i- beam and bed plate of 50 ton static road weighbridge installed at birsa project.
Dismantling/repairing, cutting and welding of i- beam and bed plate of 50 ton static road weighbridge installed at birsa project.
Read moreRepairing cutting welding and maintenance for 50 te road weighbridge installed at kk more under sayal-d ocp.
Repairing cutting welding and maintenance for 50 te road weighbridge installed at kk more under sayal-d ocp.
Read moreDismantling/repairing, cutting, welding of i beam and m.s plate etc. of 60 ten new rod weigh bridge under birsa project.
Dismantling/repairing, cutting, welding of i beam and m.s plate etc. of 60 ten new rod weigh bridge under birsa project.
Read moreFabrication of our earthing screens over 50 ton hesabeda weighbridge 60 ton new birsa weighbridge 750kva transformer and 250kva transformer installed at rehabilitation and resettlement site respectively at birsa projec
Fabrication of our earthing screens over 50 ton hesabeda weighbridge 60 ton new birsa weighbridge 750kva transformer and 250kva transformer installed at rehabilitation and resettlement site respectively at birsa projec
Read moreof your Industry type