Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Devnaran Mandir Chamarda To Indore Kota Rod I/C Electrification And Rising Of Overhead Line Length 0.60 Km Distt Agar Malwa
|
Description |
Construction Of Devnaran Mandir Chamarda To Indore Kota Rod I/C Electrification And Rising Of Overhead Line Length 0.60 Km Distt Agar Malwa
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_293940_1 |
Reference Number |
12/SAC/2023-24/25-07-2023 |
Tender Fee | 5000 |
EMD | 50000 |
Tender Value | |
Place | UJJAIN |
Link | https://mptenders.gov.in |
Start Date | July 26, 2023 16:00 |
End Date |
09/08/2023 ( Expired 672 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreNib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Nib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Read moreInvestigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in bisalpur npp
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in faridpur npp
Investigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreof your Industry type