Tender Details

Particulars Details
Title
Electrical(g) Portion Of Work (1)provision Of Rub At Km 749/5 7 Near Lc No. 378(nipania Gate) Km 749/13 15 Between Npi Dgs Section On Howrah Mumbai Main Line. (2) Provision Of Rub In Lieu Of Lc No. 387 At Km 770/7 9 Between Byt Hn Section On Howrah Mumbai Main Line (3) Provision Of Rub At Km 783/25 27 In Lieu Of Lc No. 393(kesda Gate) Km 784/3 5 Hn Tld Section. (4) Construction Of Rub At Km 800/21 23 In Lieu Of Lc No. 403 Between Bkth Slh Section In Howrah Mumbai Main Line. (5) Construction O
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73577015
Reference
Number
SrDEE-G-R-OTP-23-24-28
Tender Fee 0
EMD 27300
Tender Value
Place Bilaspur
Link https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73577015/viewNitPdf_4480294.pdf
Start Date February 15, 2024 21:47
End Date

14/03/2024 ( Expired 453 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar

Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar

Read more
Providing led street light arrangements to the rob at km 1/6 of siruthaiyur to sengaraiyur road in lieu of existing lc no 226 at railway km 311/8-9 between kattur to lalgudi station at lalgudi in trichy district.

Providing led street light arrangements to the rob at km 1/6 of siruthaiyur to sengaraiyur road in lieu of existing lc no 226 at railway km 311/8-9 between kattur to lalgudi station at lalgudi in trichy district.

Read more
Special repair to sewage line for type iii md accn at matri complex special repair to roof gutter of grc group bld no p 192 and provision of septic tank and soak well and allied services at main gate of technical area in r and de e pune

Special repair to sewage line for type iii md accn at matri complex special repair to roof gutter of grc group bld no p 192 and provision of septic tank and soak well and allied services at main gate of technical area in r and de e pune

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur

Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur

Read more
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Read more
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise