Tender Details
Particulars | Details |
---|---|
Title |
Facelfting And Painting Of Boundary Walls At Backside Lane Of Salarh Fort In Ward No. 74, Chandni Chowk, City Sp Zone.
|
Description |
Facelfting And Painting Of Boundary Walls At Backside Lane Of Salarh Fort In Ward No. 74, Chandni Chowk, City Sp Zone.
|
Organisation | Municipal Corporation of Delhi | Public Sector Undertakings |
Tender Id | 2025_MCD_237054_1 |
Reference Number |
EE(M)-II/CITY-SPZ/25-26/06.02 |
Tender Fee | 590 |
EMD | 6350 |
Tender Value | |
Place | Chandni Chowk |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=269162 |
Start Date | May 30, 2025 23:00 |
End Date |
06/06/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConst. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreof your Industry type