| Title |
Execution Of Protective Works For Slope Protection And Retention Loc For Rd Safety At Km 42.800 (Both Hill And Valley Side) And Km 54.000(valley Side) (Huri Axis) On Lee Huri Rd Including Geological Investigation, 85 Rcc/756 Tf P Ank On Epc Mode
|
| Description |
Execution Of Protective Works For Slope Protection And Retention Loc For Rd Safety At Km 42.800 (Both Hill And Valley Side) And Km 54.000(valley Side) (Huri Axis) On Lee Huri Rd Including Geological Investigation, 85 Rcc/756 Tf P Ank On Epc Mode
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2023_BRO_624360_1 |
|
Reference Number |
ANK/NIT-20/2023-24 (EPC) |
| Tender Fee | 10000 |
| EMD | 37.67 Lakh |
| Tender Value | - |
| Place | Chief Engineer (P) Arunank |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | November 14, 2023 22:45 |
| End Date |
Expired
24/11/2023
Expired 1054 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engaging technical consult for prep of fs (dpr) on epc mode for const of rd huri-taksing (new alignment) from km 0.000 to km 95.348 from green field to nhdl specifications in 85 rcc/756 brtf under project ank in the state of arunachal pradesh
Engaging technical consult for prep of fs (dpr) on epc mode for const of rd huri-taksing (new alignment) from km 0.000 to km 95.348 from green field to nhdl specifications in 85 rcc/756 brtf under project ank in the state of arunachal pradesh
Read moreExecution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap
Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap
Read moreExecution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode
Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode
Read moreExec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc
Read moreExec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc
Read moreS/s of stone metal 63 mm s/metal 45mm s/chips 6.70mm, at km 158.00 to 197.00 on h-s-h rd (sarli axis) for wbm wrks s/chips 13.20mm, s/chips 11.20mm,s/chips 6.7mm at hmp site for execut of irqp, rehab 119rcc/756tf (p)ank in upper subansiri dist of a.p
S/s of stone metal 63 mm s/metal 45mm s/chips 6.70mm, at km 158.00 to 197.00 on h-s-h rd (sarli axis) for wbm wrks s/chips 13.20mm, s/chips 11.20mm,s/chips 6.7mm at hmp site for execut of irqp, rehab 119rcc/756tf (p)ank in upper subansiri dist of a.p
Read moreExec of slope stabilization works and river training wks at km 1.00 on road tcc-maza and km 6.900, km 33.820,km 35.800 on d-t rd including geological investigation, prep of design and its proof check from iit under 23 tf/ p ank in upper subansiri a.p
Exec of slope stabilization works and river training wks at km 1.00 on road tcc-maza and km 6.900, km 33.820,km 35.800 on d-t rd including geological investigation, prep of design and its proof check from iit under 23 tf/ p ank in upper subansiri a.p
Read moreof your Industry type