Tender Details

Particulars Details
Title
Execution Of Protective Works For Slope Protection And Retention Loc For Rd Safety At Km 42.800 (Both Hill And Valley Side) And Km 54.000(valley Side) (Huri Axis) On Lee Huri Rd Including Geological Investigation, 85 Rcc/756 Tf P Ank On Epc Mode
Description
Execution Of Protective Works For Slope Protection And Retention Loc For Rd Safety At Km 42.800 (Both Hill And Valley Side) And Km 54.000(valley Side) (Huri Axis) On Lee Huri Rd Including Geological Investigation, 85 Rcc/756 Tf P Ank On Epc Mode
Organisation Defence eProcurement Portal
Tender Id 2023_BRO_624360_1
Reference
Number
ANK/NIT-20/2023-24 (EPC)
Tender Fee 10000
EMD 37.67 Lakh
Tender Value -
Place Chief Engineer (P) Arunank
Link
View Original Tender Notice

https://defproc.gov.in

Start Date November 14, 2023 22:45
End Date
Expired 24/11/2023

Expired 1054 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engaging technical consult for prep of fs (dpr) on epc mode for const of rd huri-taksing (new alignment) from km 0.000 to km 95.348 from green field to nhdl specifications in 85 rcc/756 brtf under project ank in the state of arunachal pradesh

Engaging technical consult for prep of fs (dpr) on epc mode for const of rd huri-taksing (new alignment) from km 0.000 to km 95.348 from green field to nhdl specifications in 85 rcc/756 brtf under project ank in the state of arunachal pradesh

Read more
Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap

Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap

Read more
Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode

Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode

Read more
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Read more
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Read more
S/s of stone metal 63 mm s/metal 45mm s/chips 6.70mm, at km 158.00 to 197.00 on h-s-h rd (sarli axis) for wbm wrks s/chips 13.20mm, s/chips 11.20mm,s/chips 6.7mm at hmp site for execut of irqp, rehab 119rcc/756tf (p)ank in upper subansiri dist of a.p

S/s of stone metal 63 mm s/metal 45mm s/chips 6.70mm, at km 158.00 to 197.00 on h-s-h rd (sarli axis) for wbm wrks s/chips 13.20mm, s/chips 11.20mm,s/chips 6.7mm at hmp site for execut of irqp, rehab 119rcc/756tf (p)ank in upper subansiri dist of a.p

Read more
Exec of slope stabilization works and river training wks at km 1.00 on road tcc-maza and km 6.900, km 33.820,km 35.800 on d-t rd including geological investigation, prep of design and its proof check from iit under 23 tf/ p ank in upper subansiri a.p

Exec of slope stabilization works and river training wks at km 1.00 on road tcc-maza and km 6.900, km 33.820,km 35.800 on d-t rd including geological investigation, prep of design and its proof check from iit under 23 tf/ p ank in upper subansiri a.p

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise