Tender Details

Particulars Details
Title
Annual Maintenance Pac Iv Area
Description
Annual Maintenance Of Pac Iv And Surrounding Toilets At Tirumala For The Year 2026 27
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 935712
Reference
Number
ADV.07/D3/CE/TTD/2026-27
Tender Fee 950
EMD 26900
Tender Value -
Place AP
Link
View Original Tender Notice

https://tender.apeprocurement.gov.in

Start Date May 19, 2026 00:30
End Date
Expired 04/06/2026

Expired 122 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.

Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.

Read more
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Read more
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Annual maintenance of pac-iv and surrounding toilets at tirumala for the year 2024-25

Annual maintenance of pac-iv and surrounding toilets at tirumala for the year 2024-25

Read more
Pac of consumables for genexpert iv

Pac of consumables for genexpert iv

Read more
Annual housekeeping area maintenance

Annual housekeeping area maintenance

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise