Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply, Installation, Testing And Commissioning Of Telecom Material In Connection With (1) Metro Rail Over Bridge Obligatory Span P11 P12 At Metro Rail Ch: 25766.50 &Amp Railway Km. 72/01 &Amp 72/03 Between Laxmibai Nagar To Mangliya Railway Stations. (2) Godhara Nagda Section: Providing Subway At Km 559/02 04 By Air Pushing Method For Between Bordi Anas. (3) Ratlam Godhara Section: Construction Of Rub At Km 522/08 10 (5.5 M X 4.5 M Rcc Box) On Deposit Basis.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72583402 |
|
Reference Number |
SandT-RTM-23-Tele-20 |
| Tender Fee | 0 |
| EMD | 11900 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72583402/viewNitPdf_4426165.pdf |
| Start Date | January 03, 2024 23:08 |
| End Date |
Expired
25/01/2024
Expired 996 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
Mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
Read moreProposed shifting of exg. bridge with 1 x 1.80 m dia rcc pipe at km 72/069 by micro tunneling. ( br. no.eak 189 up & dn between tzhi and kvta railway stations.
Proposed shifting of exg. bridge with 1 x 1.80 m dia rcc pipe at km 72/069 by micro tunneling. ( br. no.eak 189 up & dn between tzhi and kvta railway stations.
Read moreDesign, engineering, supply, installation, testing and commissioningof 03 nos. integrated traction substations at yog nagri rishikesh,srinagar and karanprayag in connection with railway electrificationof new bg rail line between rishikesh and karnprayag in the state ofuttarakhand.
Design, engineering, supply, installation, testing and commissioningof 03 nos. integrated traction substations at yog nagri rishikesh,srinagar and karanprayag in connection with railway electrificationof new bg rail line between rishikesh and karnprayag in the state ofuttarakhand.
Read moreExecution of balance works i.e. drain & toe wall, protection works of cutting area and other miscellaneous civil engineering works between ghatoli station to biaora station, in the state of rajasthan & madhya pradesh, in connection with the ramganjmandi-bhopal new bg rail line project of kota division, west central railway
Execution of balance works i.e. drain & toe wall, protection works of cutting area and other miscellaneous civil engineering works between ghatoli station to biaora station, in the state of rajasthan & madhya pradesh, in connection with the ramganjmandi-bhopal new bg rail line project of kota division, west central railway
Read moreConstruction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Read moreSupply, installation, testing and commissioning of telecom material in connection with (1) metro rail over bridge obligatory span p11-p12 at metro rail ch: 25766.50 & railway km. 72/01 & 72/03 between laxmibai nagar to mangliya railway stations. (2) godhara-nagda section:- providing subway at km 559/02-04 by air pushing method for between bordi-anas. (3) ratlam-godhara section:- construction of rub at km 522/08-10 (5.5 m x 4.5 m rcc box) on deposit basis.
For complete deion and other details, please refer to tender
Read moreDesign and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreProject management consultancy services for construction of proposed rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway station along mr-10 road indore
Project management consultancy services for construction of proposed rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway station along mr-10 road indore
Read moreMaintenance contract of civil works addition alterationmodification repair maintenance of various stations rss buildings between mansaroto badi chaupar and any other metro railway premises of jaipur metro rail corporation at jaipur
As per bid documents
Read moreAllotment of land in between circular railway track and strand rd adjacent with bbd bag circular rail
Allotment of land in between circular railway track and strand rd adjacent with bbd bag circular rail
Read moreof your Industry type