Tender Details

Particulars Details
Title
Construction Of Road From Pwd Path To Raksha Bhumihar Tola Upto Tumbo Yadav Tola(length 3.14 Km.Rwd/Ee/Deoghar/19/2024 25
Description
Construction Of Road From Pwd Path To Raksha Bhumihar Tola Upto Tumbo Yadav Tola(length 3.14 Km.Rwd/Ee/Deoghar/19/2024 25
Organisation RWD EinC | State Govt. and UT
Tender Id 2024_RWD_90013_1
Reference
Number
RWD/EE/DEOGHAR/19/2024-25
Tender Fee 10000
EMD 6 Lakh
Tender Value
Place Deoghar
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=121550
Start Date August 14, 2024 22:30
End Date

27/08/2024 ( Expired 263 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border

Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Construction work of rcc drain ward no 01 khambaba road sh 19 from kamal ahirwar house to rana ji puliya vidisha

Construction work of rcc drain ward no 01 khambaba road sh 19 from kamal ahirwar house to rana ji puliya vidisha

Read more
Construction of cc road and rcc drain from yadav gali gousiya kirana to jhutta panda-madarsa in ramakavi ward

Construction of cc road and rcc drain from yadav gali gousiya kirana to jhutta panda-madarsa in ramakavi ward

Read more
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Read more
Construction and maintenance of l155 pwd road to gudada under pm-janman batch-ii (2024-25)

Construction and maintenance of l155 pwd road to gudada under pm-janman batch-ii (2024-25)

Read more
Periodical renewal of pwd road from dasherghat to gairing para(l-1.8km) during the year 2024-25/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.90km to 1.80km(gr-ii).

Periodical renewal of pwd road from dasherghat to gairing para(l-1.8km) during the year 2024-25/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.90km to 1.80km(gr-ii).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise