Particulars | Details |
---|---|
Title |
Composite Tender For Furnishing And Electric Work For The New Premises For Niwari Branch M P
|
Description |
Composite Tender For Furnishing And Electric Work For The New Premises For Niwari Branch M P
|
Organisation | Union Bank of India | Central Govt. Ministry/Department |
Tender Id | 2024_UBoI_746909_1 |
Reference Number |
COMPOSITE FURNISHING TENDER FOR NIWARI BRANCH |
Tender Fee | 1000 |
EMD | 39000 |
Tender Value | |
Place | WORK |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1050055 |
Start Date | February 22, 2024 15:30 |
End Date |
01/03/2024 ( Expired 476 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreTender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreDevelopment of dharmshala yatri niwas and also furniture work in room at old tahsil office premises for cm parli vaijnath dist beed
Development of dharmshala yatri niwas and also furniture work in room at old tahsil office premises for cm parli vaijnath dist beed
Read moreAAAAAAAAAA
Login to viewRepair and rehabilitation work for loose ceiling plaster for 1st floor qtrs at moti bagh under 1/q sub divn new delhi dg. 2025-26
Read moreRepair/maint including periodic testing of earthing infra at various danger buildings, repair/maint including replacement of electric lt switchgears and panels in wsa area and work services for periodic cleaning of overheads tanks including testing o
Repair/maint including periodic testing of earthing infra at various danger buildings, repair/maint including replacement of electric lt switchgears and panels in wsa area and work services for periodic cleaning of overheads tanks including testing o
Read moreAnnual repair and maintenance work for existing structures i/e electrification at new and old mandi yard vidisha. (iiird call)
Annual repair and maintenance work for existing structures i/e electrification at new and old mandi yard vidisha. &#x0d (iiird call)&#x0d
Read moreTender for renovation, renovation of jugmandar hall and construction work of frp (facade) inside the hall and outside the main building
Tender for renovation, renovation of jugmandar hall and construction work of frp (facade) inside the hall and outside the main building
Read moreCarrying out supply,installation,testing and commission of electr system for jetty-10,11 on sub contract basis in connection with composite works for aromatic pipeline and jetty works(p-b)for offsite pipelines and jetty infrastr projects mrpl
Carrying out supply,installation,testing and commission of electr system for jetty-10,11 on sub contract basis in connection with composite works for aromatic pipeline and jetty works(p-b)for offsite pipelines and jetty infrastr projects mrpl
Read moreof your Industry type