Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Second Point Supply Work On Semi Turnkey Basis At 83 Places Along With Htlt Lines In Various Selected Villages Under Executive Engineer Electricity Distribution Division Mehdawal (Under Rs. 20 Crore Work Plan).
|
| Description |
Second Point Supply Work On Semi Turnkey Basis At 83 Places Along With Htlt Lines In Various Selected Villages Under Executive Engineer Electricity Distribution Division Mehdawal (Under Rs. 20 Crore Work Plan).
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_835808_1 |
|
Reference Number |
70/EDC(SKN)2023-24 |
| Tender Fee | 3540 |
| EMD | 43000 |
| Tender Value | - |
| Place | Sant Kabir Nagar |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 07, 2023 14:30 |
| End Date |
Expired
20/09/2023
Expired 1121 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
A total of 56 works under the edd-mehdawal, respectively, the work of second point supply with hta at lines in 40 different villages and the work of replacing dilapidated abc cables in 16 villages on semi-turnkey basis (13 crore work plan) under)
A total of 56 works under the edd-mehdawal, respectively, the work of second point supply with hta at lines in 40 different villages and the work of replacing dilapidated abc cables in 16 villages on semi-turnkey basis (13 crore work plan) under)
Read moreTo overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
To overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
Read moreWork of installation of additional transformers (as per attached list) in 39 villages/localities under executive engineer electricity distribution division, khalilabad on semi-turnkey basis (under 20 crore work plan)
Work of installation of additional transformers (as per attached list) in 39 villages/localities under executive engineer electricity distribution division, khalilabad on semi-turnkey basis (under 20 crore work plan)
Read moreUnder executive engineer electricity distribution division mehdawal, the works to be done under the deposit scheme for connecting the new villages, localities of mehdawal town with the urban power supply, municipal body extension.
Under executive engineer electricity distribution division mehdawal, the works to be done under the deposit scheme for connecting the new villages, localities of mehdawal town with the urban power supply, municipal body extension.
Read moreSitc for creation of 400kva distributions with htlt line for bus stand at thandi khui jakh under the jurisdiction of executive engineer electric division vijaypur on turnkey basis
Sitc for creation of 400kva distributions with htlt line for bus stand at thandi khui jakh under the jurisdiction of executive engineer electric division vijaypur on turnkey basis
Read moreSitc for creation of 400kva distributions substation with htlt line for bus stand at thandi khui jakh under the jurisdiction of executive engineer electric division vijaypur on turnkey basis.
Sitc for creation of 400kva distributions substation with htlt line for bus stand at thandi khui jakh under the jurisdiction of executive engineer electric division vijaypur on turnkey basis.
Read moreUnder the edd-kld, a total of 36 capacity additions in various villages/localities and second point supply and supply at a number of places.work of installation of 1-1 trolley converter at 3 places on semi-turnkey basis (under 13 crore work plan)
Under the edd-kld, a total of 36 capacity additions in various villages/localities and second point supply and supply at a number of places.work of installation of 1-1 trolley converter at 3 places on semi-turnkey basis (under 13 crore work plan)
Read moreWork of supply of testing equipment and material under the business plan year 2023-24 under the executive engineer electricity test division, sant kabir nagar (under rs. 13 crore work plan)
Work of supply of testing equipment and material under the business plan year 2023-24 under the executive engineer electricity test division, sant kabir nagar (under rs. 13 crore work plan)
Read moreUnder executive engineer electricity distribution division mehdawal, the work of getting the new villages and localities of nagar panchayat bakhira under the deposit scheme to be connected with the urban power supply.
Under executive engineer electricity distribution division mehdawal, the work of getting the new villages and localities of nagar panchayat bakhira under the deposit scheme to be connected with the urban power supply.
Read moreWork of installation of additional transformers (as per attached list) in 61 villages/localities under the area of edd-i/ii/iii/iv ballia on semi-turnkey basis (under 20 crore work plan)
Work of installation of additional transformers (as per attached list) in 61 villages/localities under the area of edd-i/ii/iii/iv ballia on semi-turnkey basis (under 20 crore work plan)
Read moreof your Industry type