Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Supply Of Testing Equipment And Material Under The Business Plan Year 2023 24 Under The Executive Engineer Electricity Test Division, Sant Kabir Nagar (Under Rs. 13 Crore Work Plan)
|
| Description |
Work Of Supply Of Testing Equipment And Material Under The Business Plan Year 2023 24 Under The Executive Engineer Electricity Test Division, Sant Kabir Nagar (Under Rs. 13 Crore Work Plan)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_837032_1 |
|
Reference Number |
82/EDC(SKN)2023-24 |
| Tender Fee | 3540 |
| EMD | 17000 |
| Tender Value | - |
| Place | Sant Kabir Nagar |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 12, 2023 14:30 |
| End Date |
Expired
20/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
The work of issuing new connections of government iti chakdahi and government iti majhaura of sant kabir nagar district under executive engineer electricity distribution division khalilabad.
The work of issuing new connections of government iti chakdahi and government iti majhaura of sant kabir nagar district under executive engineer electricity distribution division khalilabad.
Read moreWork of laying of power lines for 33 non-electrified schools of basic education department sant kabir nagar under the deposit scheme under executive engineer, electricity distribution division, khalilabad.
Work of laying of power lines for 33 non-electrified schools of basic education department sant kabir nagar under the deposit scheme under executive engineer, electricity distribution division, khalilabad.
Read moreEdd-iii, sakaldiha in the work plan of rs. 20.00 crore allocated for system strengthening under the additional business plan 2023-24 in edsd-ii, bhupauli. on semi turn-key basis
Edd-iii, sakaldiha in the work plan of rs. 20.00 crore allocated for system strengthening under the additional business plan 2023-24 in edsd-ii, bhupauli. on semi turn-key basis
Read moreSupply of metering and testing equipment in the area of electricity test divsion deoria under additional business plan 2023-2024
Supply of metering and testing equipment in the area of electricity test divsion deoria under additional business plan 2023-2024
Read moreSupply of metering and testing equipment in the area of electricity test divsion deoria under additional business plan 2023-2024
Supply of metering and testing equipment in the area of electricity test divsion deoria under additional business plan 2023-2024
Read moreWork of shifting of electric poles/systems from nh road to patkhauli road to connect it with two lanes of sant kabir nagar district under executive engineer electricity distribution division khalilabad
Work of shifting of electric poles/systems from nh road to patkhauli road to connect it with two lanes of sant kabir nagar district under executive engineer electricity distribution division khalilabad
Read moreSecond point supply work on semi-turnkey basis at 83 places along with htlt lines in various selected villages under executive engineer electricity distribution division mehdawal (under rs. 20 crore work plan).
Second point supply work on semi-turnkey basis at 83 places along with htlt lines in various selected villages under executive engineer electricity distribution division mehdawal (under rs. 20 crore work plan).
Read moreConsultancy services for surveying, soil investigation, architectural planning, interior designing and equipment for construction of marwar medical university, jodhpur (phase-i) (approximate cost of project is rs. 100.00 crore)
Consultancy services for surveying, soil investigation, architectural planning, interior designing and equipment for construction of marwar medical university, jodhpur (phase-i) (approximate cost of project is rs. 100.00 crore)
Read moreEdd-iiird, sakaldiha in the work plan of rs. 20.00 crore allocated for the work of system strengthening under the additional business plan 2023-24 in edsd-i, iii, kamalpur. on semi-turn-key basis.
Edd-iiird, sakaldiha in the work plan of rs. 20.00 crore allocated for the work of system strengthening under the additional business plan 2023-24 in edsd-i, iii, kamalpur. on semi-turn-key basis.
Read moreSupply of mri communication cord with rs 232 optical port, 2mts length in the area of executive engineer, electricity urban test division, mathura
Supply of mri communication cord with rs 232 optical port, 2mts length in the area of executive engineer, electricity urban test division, mathura
Read moreof your Industry type