Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A Total Of 56 Works Under The Edd Mehdawal, Respectively, The Work Of Second Point Supply With Hta At Lines In 40 Different Villages And The Work Of Replacing Dilapidated Abc Cables In 16 Villages On Semi Turnkey Basis (13 Crore Work Plan) Under)
|
| Description |
A Total Of 56 Works Under The Edd Mehdawal, Respectively, The Work Of Second Point Supply With Hta At Lines In 40 Different Villages And The Work Of Replacing Dilapidated Abc Cables In 16 Villages On Semi Turnkey Basis (13 Crore Work Plan) Under)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_835819_1 |
|
Reference Number |
76/EDC(SKN)2023-24 |
| Tender Fee | 3540 |
| EMD | 33000 |
| Tender Value | - |
| Place | Sant Kabir Nagar |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 07, 2023 14:30 |
| End Date |
Expired
20/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Second point supply work on semi-turnkey basis at 83 places along with htlt lines in various selected villages under executive engineer electricity distribution division mehdawal (under rs. 20 crore work plan).
Second point supply work on semi-turnkey basis at 83 places along with htlt lines in various selected villages under executive engineer electricity distribution division mehdawal (under rs. 20 crore work plan).
Read moreWork of increasing the capacity of new overloaded transformers and replacement of dilapidated abc under the business plan year 2024-25 phase-2 under electricity distribution division mehdawal.
Work of increasing the capacity of new overloaded transformers and replacement of dilapidated abc under the business plan year 2024-25 phase-2 under electricity distribution division mehdawal.
Read moreTo overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
To overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
Read moreUnder the business plan year 2023-24, under the amount of rs. 40 lakhs allocated to the division, the work of converting the dilapidated 11kv town feeder 11kv abc into dog driver under 33/11 kv sub-station mehdawal town under the edd-mehdawal
Under the business plan year 2023-24, under the amount of rs. 40 lakhs allocated to the division, the work of converting the dilapidated 11kv town feeder 11kv abc into dog driver under 33/11 kv sub-station mehdawal town under the edd-mehdawal
Read moreSupply of 1.1kv abc with accessories and constructing 11.35 km of lt overhead line with abc by replacing the existing oh line on turnkey basis at different locations under electrical sub division, muthuvara, thrissur west
Supply of 1.1kv abc with accessories and constructing 11.35 km of lt overhead line with abc by replacing the existing oh line on turnkey basis at different locations under electrical sub division, muthuvara, thrissur west
Read moreWork of installation of additional transformers (as per attached list) in 39 villages/localities under executive engineer electricity distribution division, khalilabad on semi-turnkey basis (under 20 crore work plan)
Work of installation of additional transformers (as per attached list) in 39 villages/localities under executive engineer electricity distribution division, khalilabad on semi-turnkey basis (under 20 crore work plan)
Read moreA total of 40 works under the edd-mehdawal, respectively, 36 works of capacity increase work of overloaded distribution transformers, 3 works of trolley transformer installation work, work of separation of pachpokhari indodutch feeder on semi turnkey
A total of 40 works under the edd-mehdawal, respectively, 36 works of capacity increase work of overloaded distribution transformers, 3 works of trolley transformer installation work, work of separation of pachpokhari indodutch feeder on semi turnkey
Read moreTotal 19 different works, 03 feeder separation work, 11 dilapidated incoming and outgoing vcb replacement work and improvement work of switchyard of power sub-station on semi-turnkey basis (under 20 crore work plan) under edd-meh
Total 19 different works, 03 feeder separation work, 11 dilapidated incoming and outgoing vcb replacement work and improvement work of switchyard of power sub-station on semi-turnkey basis (under 20 crore work plan) under edd-meh
Read moreSupply of 1.1kv abc with accessories and constructing 16.01km of lt oh line with abc of size 3x70sq mm, 1x50sqmm and 1x16sqmm on existing psc pole by replacing the existing oh line on turnkey basis at different locations under esd, kandassankadavu
Supply of 1.1kv abc with accessories and constructing 16.01km of lt oh line with abc of size 3x70sq mm, 1x50sqmm and 1x16sqmm on existing psc pole by replacing the existing oh line on turnkey basis at different locations under esd, kandassankadavu
Read moreWork of installation of additional transformers (as per attached list) in 61 villages/localities under the area of edd-i/ii/iii/iv ballia on semi-turnkey basis (under 20 crore work plan)
Work of installation of additional transformers (as per attached list) in 61 villages/localities under the area of edd-i/ii/iii/iv ballia on semi-turnkey basis (under 20 crore work plan)
Read moreof your Industry type