| Particulars | Details |
|---|---|
| Title |
Under The Business Plan Year 2023 24, Under The Amount Of Rs. 40 Lakhs Allocated To The Division, The Work Of Converting The Dilapidated 11 Kv Town Feeder 11 Kv Abc Into Dog Driver Under 33/11 Kv Sub Station Mehdawal Town Under The Edd Mehdawal
|
| Description |
Under The Business Plan Year 2023 24, Under The Amount Of Rs. 40 Lakhs Allocated To The Division, The Work Of Converting The Dilapidated 11 Kv Town Feeder 11 Kv Abc Into Dog Driver Under 33/11 Kv Sub Station Mehdawal Town Under The Edd Mehdawal
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_842634_1 |
|
Reference Number |
85/EDC(SKN)2023-24 |
| Tender Fee | 1180 |
| EMD | 4000 |
| Tender Value | - |
| Place | Sant Kabir Nagar |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 23, 2023 21:30 |
| End Date |
Expired
08/11/2023
Expired 1073 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of increasing the capacity of new overloaded transformers and replacement of dilapidated abc under the business plan year 2024-25 phase-2 under electricity distribution division mehdawal.
Work of increasing the capacity of new overloaded transformers and replacement of dilapidated abc under the business plan year 2024-25 phase-2 under electricity distribution division mehdawal.
Read moreReplacement of dilapidated abc cable dilapidated wire installed on lt line under work plan of rs.20.00 cr. allocated for system strengthening work under additional bp 2023-24 in edd-ii, mgs. on semi-turn-key basis.
Replacement of dilapidated abc cable dilapidated wire installed on lt line under work plan of rs.20.00 cr. allocated for system strengthening work under additional bp 2023-24 in edd-ii, mgs. on semi-turn-key basis.
Read moreAdd. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis
Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis
Read moreAdd. bp 2023-24 in edd-i, chandauli work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line. on semi turn-key basis.
Add. bp 2023-24 in edd-i, chandauli work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line. on semi turn-key basis.
Read moreUnder business plan 2022-23 in edd-ist, chandauli, 33/11kv sub-station-chakia 11kv saidupur feeder, between changing dilapidated wire of lt line in village-garla and loose/long span pole installation work.
Under business plan 2022-23 in edd-ist, chandauli, 33/11kv sub-station-chakia 11kv saidupur feeder, between changing dilapidated wire of lt line in village-garla and loose/long span pole installation work.
Read moreUnder the business plan year 2023-24, the work of double circuit cabling of 33kv oswal feeder railway line south east under the edd-khalilabad under the amount of rs. 40 lakhs allocated to the division
Under the business plan year 2023-24, the work of double circuit cabling of 33kv oswal feeder railway line south east under the edd-khalilabad under the amount of rs. 40 lakhs allocated to the division
Read moreUnder the business plan year 2024-25 phase-1 under electricity distribution division khalilabad, the work of replacing dilapidated conductors and replacement of 11kv fuse and lt lead on transformers
Under the business plan year 2024-25 phase-1 under electricity distribution division khalilabad, the work of replacing dilapidated conductors and replacement of 11kv fuse and lt lead on transformers
Read moreUnder the additional bp 2023-24 in edd-i, chandauli, under the work plan of rs.20.00 crore allocated for system strengthening work, 11kv line construction work strengthening and lt line dilapidated ab cable/wire will be done. on semi turn-key basis
Under the additional bp 2023-24 in edd-i, chandauli, under the work plan of rs.20.00 crore allocated for system strengthening work, 11kv line construction work strengthening and lt line dilapidated ab cable/wire will be done. on semi turn-key basis
Read moreA total of 56 works under the edd-mehdawal, respectively, the work of second point supply with hta at lines in 40 different villages and the work of replacing dilapidated abc cables in 16 villages on semi-turnkey basis (13 crore work plan) under)
A total of 56 works under the edd-mehdawal, respectively, the work of second point supply with hta at lines in 40 different villages and the work of replacing dilapidated abc cables in 16 villages on semi-turnkey basis (13 crore work plan) under)
Read moreFor spare line of 33/11 kv s/s dph to ug cable 11kv town-4 feeder by new 11 kv over head underground cable, varanasi under business plan 2023-24.
For spare line of 33/11 kv s/s dph to ug cable 11kv town-4 feeder by new 11 kv over head underground cable, varanasi under business plan 2023-24.