Add. Bp 2023 24 In Edd I, Chandauli Work Plan Of Rs. 07.50 Cr. Allocated For System Strengthening Work Includes Installation Of Add. Converter And Capacity Increase, Dilapidated Abc Cable Dilapidated Wire Installed On Lt Line. On Semi Turn Key Basis.
Description
Add. Bp 2023 24 In Edd I, Chandauli Work Plan Of Rs. 07.50 Cr. Allocated For System Strengthening Work Includes Installation Of Add. Converter And Capacity Increase, Dilapidated Abc Cable Dilapidated Wire Installed On Lt Line. On Semi Turn Key Basis.
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNV_838300_1
Reference
Number
47/EDC(C)/2023-24
Tender Fee 1180
EMD 4500
Tender Value -
Place Chandauli
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date September 15, 2023 14:30
End Date
Expired 25/09/2023

Expired 1114 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis

Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis

Read more
Work plan of rs. 07.50 cr. system strengthening under the add. bp 2023-24 in edd-ii, mughalsarai include installation of add. converter and capacity increase, double circuiting, line, other station related. on semi turn-key basis.

Work plan of rs. 07.50 cr. system strengthening under the add. bp 2023-24 in edd-ii, mughalsarai include installation of add. converter and capacity increase, double circuiting, line, other station related. on semi turn-key basis.

Read more
Replacement of dilapidated abc cable dilapidated wire installed on lt line under work plan of rs.20.00 cr. allocated for system strengthening work under additional bp 2023-24 in edd-ii, mgs. on semi-turn-key basis.

Replacement of dilapidated abc cable dilapidated wire installed on lt line under work plan of rs.20.00 cr. allocated for system strengthening work under additional bp 2023-24 in edd-ii, mgs. on semi-turn-key basis.

Read more
The work plan of rs. 20.00 cr. allocated for the system strengthening work under additional bp 2023-24 in edd-i, chandauli, the work of replacing the dilapidated ab cable dilapidated wire installed on the lt line. on semi turn-key basis

The work plan of rs. 20.00 cr. allocated for the system strengthening work under additional bp 2023-24 in edd-i, chandauli, the work of replacing the dilapidated ab cable dilapidated wire installed on the lt line. on semi turn-key basis

Read more
Work of supplying materials related to protection of 33 11kv sub-stations under the work plan of rs. 07.50 crore allocated for the work of system strengthening under additional bp 2023-24 in etd-chandauli. (on semi turn-key basis)

Work of supplying materials related to protection of 33 11kv sub-stations under the work plan of rs. 07.50 crore allocated for the work of system strengthening under additional bp 2023-24 in etd-chandauli. (on semi turn-key basis)

Read more
Under the additional bp 2023-24 in edd-i, chandauli, under the work plan of rs.20.00 crore allocated for system strengthening work, 11kv line construction work strengthening and lt line dilapidated ab cable/wire will be done. on semi turn-key basis

Under the additional bp 2023-24 in edd-i, chandauli, under the work plan of rs.20.00 crore allocated for system strengthening work, 11kv line construction work strengthening and lt line dilapidated ab cable/wire will be done. on semi turn-key basis

Read more
Establishment of additional distribution transformer in the works to be done under the work plan of rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in edd-i, chandauli. on semi turn-key basis

Establishment of additional distribution transformer in the works to be done under the work plan of rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in edd-i, chandauli. on semi turn-key basis

Read more
Increasing the capacity of distribution transformers is among the works to be done under the work plan of rs. 20.00 cr. allocated for the work of system strengthening under the additional bp 2023-24 in edd-i, chandauli. on semi-turn-key basis

Increasing the capacity of distribution transformers is among the works to be done under the work plan of rs. 20.00 cr. allocated for the work of system strengthening under the additional bp 2023-24 in edd-i, chandauli. on semi-turn-key basis

Read more
The work for replacement of jur jar a.b. conductor of l.t. line by abc under uedd-iii/viii varanasi in add. business plan 2024-25 on semi turn key basis

The work for replacement of jur jar a.b. conductor of l.t. line by abc under uedd-iii/viii varanasi in add. business plan 2024-25 on semi turn key basis

Read more
The work plan of rs. 07.50 cr. for system strengthening under the additional bp 2023-24 in edd-iii, sakaldiha, 33kv feeder lines to 33 11kv sub-station through gsm cable (3x300sqmm) 1.5km work of connecting 33kv line of ramauli on semi turn-key basi

The work plan of rs. 07.50 cr. for system strengthening under the additional bp 2023-24 in edd-iii, sakaldiha, 33kv feeder lines to 33 11kv sub-station through gsm cable (3x300sqmm) 1.5km work of connecting 33kv line of ramauli on semi turn-key basi.

Read more