Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Add. Bp 2023 24 In Edd I, Chandauli Work Plan Of Rs. 07.50 Cr. Allocated For System Strengthening Work Includes Installation Of Add. Converter And Capacity Increase, Dilapidated Abc Cable Dilapidated Wire Installed On Lt Line. On Semi Turn Key Basis.
|
| Description |
Add. Bp 2023 24 In Edd I, Chandauli Work Plan Of Rs. 07.50 Cr. Allocated For System Strengthening Work Includes Installation Of Add. Converter And Capacity Increase, Dilapidated Abc Cable Dilapidated Wire Installed On Lt Line. On Semi Turn Key Basis.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_838300_1 |
|
Reference Number |
47/EDC(C)/2023-24 |
| Tender Fee | 1180 |
| EMD | 4500 |
| Tender Value | - |
| Place | Chandauli |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 15, 2023 14:30 |
| End Date |
Expired
25/09/2023
Expired 1114 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis
Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis
Read moreWork plan of rs. 07.50 cr. system strengthening under the add. bp 2023-24 in edd-ii, mughalsarai include installation of add. converter and capacity increase, double circuiting, line, other station related. on semi turn-key basis.
Work plan of rs. 07.50 cr. system strengthening under the add. bp 2023-24 in edd-ii, mughalsarai include installation of add. converter and capacity increase, double circuiting, line, other station related. on semi turn-key basis.
Read moreReplacement of dilapidated abc cable dilapidated wire installed on lt line under work plan of rs.20.00 cr. allocated for system strengthening work under additional bp 2023-24 in edd-ii, mgs. on semi-turn-key basis.
Replacement of dilapidated abc cable dilapidated wire installed on lt line under work plan of rs.20.00 cr. allocated for system strengthening work under additional bp 2023-24 in edd-ii, mgs. on semi-turn-key basis.
Read moreThe work plan of rs. 20.00 cr. allocated for the system strengthening work under additional bp 2023-24 in edd-i, chandauli, the work of replacing the dilapidated ab cable dilapidated wire installed on the lt line. on semi turn-key basis
The work plan of rs. 20.00 cr. allocated for the system strengthening work under additional bp 2023-24 in edd-i, chandauli, the work of replacing the dilapidated ab cable dilapidated wire installed on the lt line. on semi turn-key basis
Read moreWork of supplying materials related to protection of 33 11kv sub-stations under the work plan of rs. 07.50 crore allocated for the work of system strengthening under additional bp 2023-24 in etd-chandauli. (on semi turn-key basis)
Work of supplying materials related to protection of 33 11kv sub-stations under the work plan of rs. 07.50 crore allocated for the work of system strengthening under additional bp 2023-24 in etd-chandauli. (on semi turn-key basis)
Read moreUnder the additional bp 2023-24 in edd-i, chandauli, under the work plan of rs.20.00 crore allocated for system strengthening work, 11kv line construction work strengthening and lt line dilapidated ab cable/wire will be done. on semi turn-key basis
Under the additional bp 2023-24 in edd-i, chandauli, under the work plan of rs.20.00 crore allocated for system strengthening work, 11kv line construction work strengthening and lt line dilapidated ab cable/wire will be done. on semi turn-key basis
Read moreEstablishment of additional distribution transformer in the works to be done under the work plan of rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in edd-i, chandauli. on semi turn-key basis
Establishment of additional distribution transformer in the works to be done under the work plan of rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in edd-i, chandauli. on semi turn-key basis
Read moreIncreasing the capacity of distribution transformers is among the works to be done under the work plan of rs. 20.00 cr. allocated for the work of system strengthening under the additional bp 2023-24 in edd-i, chandauli. on semi-turn-key basis
Increasing the capacity of distribution transformers is among the works to be done under the work plan of rs. 20.00 cr. allocated for the work of system strengthening under the additional bp 2023-24 in edd-i, chandauli. on semi-turn-key basis
Read moreThe work for replacement of jur jar a.b. conductor of l.t. line by abc under uedd-iii/viii varanasi in add. business plan 2024-25 on semi turn key basis
The work for replacement of jur jar a.b. conductor of l.t. line by abc under uedd-iii/viii varanasi in add. business plan 2024-25 on semi turn key basis
Read moreThe work plan of rs. 07.50 cr. for system strengthening under the additional bp 2023-24 in edd-iii, sakaldiha, 33kv feeder lines to 33 11kv sub-station through gsm cable (3x300sqmm) 1.5km work of connecting 33kv line of ramauli on semi turn-key basi
The work plan of rs. 07.50 cr. for system strengthening under the additional bp 2023-24 in edd-iii, sakaldiha, 33kv feeder lines to 33 11kv sub-station through gsm cable (3x300sqmm) 1.5km work of connecting 33kv line of ramauli on semi turn-key basi.
Read moreof your Industry type