Tender Details
Particulars | Details |
---|---|
Title |
Operation And Maintenance Of Servo Voltage Stabilizer Including Supply Of All Material Labour. T And P Etc Required For Proper Completion Of Work Which Has Been Installed At Different Tubwells Of Water Supply Scheme Under Ujs Haldwani
|
Description |
Operation And Maintenance Of Servo Voltage Stabilizer Including Supply Of All Material Labour. T And P Etc Required For Proper Completion Of Work Which Has Been Installed At Different Tubwells Of Water Supply Scheme Under Ujs Haldwani
|
Organisation | CGM (Drinking Water) Jal Sansthan | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1770 |
EMD | 40550 |
Tender Value | |
Place | Haldwani/Kathgodam |
Link |
AAAAAAAAAA Login to view |
Start Date | April 07, 2025 23:15 |
End Date |
21/04/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Read moreOperation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Read moreShifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Read moreShifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Read moreShifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis
Shifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis
Read moreSurvey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard
Survey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard
Read moreReinstatement of cc road including supply of all materials labour t and p etc required for proper completion of work etc at shyampur pumping water supply scheme of block doiwala district dehradun
Reinstatement of cc road including supply of all materials labour t and p etc required for proper completion of work etc at shyampur pumping water supply scheme of block doiwala district dehradun
Read moreSupply, construction and installation work of pump house/operator room, ms gate including boundary wall, motor pump assembly, automation penal, servo voltage stabilizer, chlorine doser and transfer etc. complete in kelakhera urban water scheme
Supply, construction and installation work of pump house/operator room, ms gate including boundary wall, motor pump assembly, automation penal, servo voltage stabilizer, chlorine doser and transfer etc. complete in kelakhera urban water scheme
Read moreComprehensive all maintenance of 110 nos water cooler and have to change require damage part which will be standard manufacture company including all t and p and labour charges etc
Comprehensive all maintenance of 110 nos water cooler and have to change require damage part which will be standard manufacture company including all t and p and labour charges etc
Read moreConfirmatory survey design construction and laying of sewer line connection to existing sewerage network testing and commissioning including supply of all material labour tand p etc for haridwar bypass road in dehradun
Confirmatory survey design construction and laying of sewer line connection to existing sewerage network testing and commissioning including supply of all material labour tand p etc for haridwar bypass road in dehradun
Read moreof your Industry type