Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
75 Mm Gold Mirror With Mount
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2023/B/4194269 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | November 10, 2023 19:56 |
| End Date |
Expired
04/12/2023
Expired 1032 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | INFRARED OPTICS PRIVATE LIMITED | Make : NA Model : MULTIPLE Title : 75mm Gold Mirror With Mount | 01-12-2023 10:27:34 | MII | Qualified |
| 2 | OPTICS AND ALLIED ENGINEERING PRIVATE LIMITED | Make : Optica Model : OPTICA-Mirror Title : 75 mm- ETP Copper Gold Mirror with Mount- 4269 | 02-12-2023 13:45:19 | MII MSE | Qualified |
| 3 | QUANTALASE ENTERPRISES PRIVATE LIMITED | Make : OEM Model : QL/GPM/75 Title : 75mm Gold Mirror with Mount | 30-11-2023 16:23:26 | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | QUANTALASE ENTERPRISES PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) | Item Categories : 75 mm Gold Mirror with Mount | 904470.00 | L1 |
| 2 | INFRARED OPTICS PRIVATE LIMITED | Item Categories : 75 mm Gold Mirror with Mount | 1203600.00 | L2 |
| 3 | OPTICS AND ALLIED ENGINEERING PRIVATE LIMITED (MII)( MSE Social Category:General ) | Item Categories : 75 mm Gold Mirror with Mount | 1708050.00 | L3 |
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreVariable nd filter,1 inch protected gold mirror,rotation mount,25 mm travel linear translation stag
Read more
Primary mirror cell,primary mirror mount,seondary mirror cell,secondary mirror mount,detector mount
Read more
of your Industry type