Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
12/Dbhgp/2024 25 Sl. No. 03/03
|
| Description |
Construction Of Litchpit, Silt Chember And Pipe Line (12 Nos) Within Samsad No. Viii Under Dakshin Bara Haldibari Gram Panchayat.
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2025_ZPHD_804206_3 |
|
Reference Number |
12/DBHGP/2024-25 |
| Tender Fee | 2000 |
| EMD | 11411 |
| Tender Value | - |
| Place | DAKSHIN BARA HALDIBARI GRAM PANCHAYAT |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1786490 |
| Start Date | January 22, 2025 15:30 |
| End Date |
Expired
30/01/2025
Expired 605 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read more13/dbhgp/2024-25 sl. no.- 03/03
Construction of litchpit, silt chember and pipe line (13 nos) within samsad no.- iii, iv, vii, viii under dakshin bara haldibari gram panchayat.
Read more04/dbhgp/25-26 sl. no. - 03/12
Construction of cc road from the house of narayan bhattacharjee to the h/o pradip sanyashi at sansad no i , booth no 147 within dakshin boro haldibari gram panchayat under haldibari development block
Read more03/dbhgp/2024-25 sl. no. - 09/09
Construction of litchpit, silt chember and pipe line at community level at sansad no.- ix under dakshin bara haldibari gram panchayat.
Read more02/dbhgp/25-26 sl. no.- 01/03
Repair of slab culvert near the house of domashu barman at pathanpara within samsad no.- viii under dakshin bara haldibari gram panchayat.
Read more11/dbhgp/2024-25 sl. no.- 04/04
Construction of litchpit, silt chember and pipe line (12 nos) within samsad no.- iv under dakshin bara haldibari gram panchayat.
Read more11/dbhgp/2024-25(2ndcall) sl. no.- 01/01
Construction of litchpit, silt chember and pipe line (12 nos) within samsad no.- i under dakshin bara haldibari gram panchayat.
Read more04/dbhgp/25-26(2nd call) sl no.- 08/12
Construction of cc road from the house of ganesh mandal to the h/o pariman sarkar at sansad no ii, booth no 148 within dakshin boro haldibari gram panchayat under haldibari development block
Read more05/dbhgp/23-24 sl no - 03/04
Construction of (24 nos) leach pit and silt chamber with drainage pipe line connection for gray water management at sansad no- 7 , 8 and 9 udar dbhgp.
Read more10/dbhgp/24-25 sl. no.- 01/05
Supply, installation, testing andcommissioning of off-grid rooftop solar pv power plant at gangdoba 2 icds c. no. 186, rangapani pry school icds centre c. no. 29 and pathanpara icds centre c. no. 22 under dbhgp.
Read moreof your Industry type