Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Sump For Rapid Filling Pumpsets At Old Ss Tank And Repairs To New Ss Tank Ramp Under Summer Action Plan 2025 In Gudivada Municipality
|
Description |
Construction Of Sump For Rapid Filling Pumpsets At Old Ss Tank And Repairs To New Ss Tank Ramp Under Summer Action Plan 2025 In Gudivada Municipality
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 205 |
EMD | 5764 |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | July 05, 2025 01:30 |
End Date |
11/07/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreHiring of latest model-2025 of 1 no. new jeep (6plus1 seater) sel or utilization period of jeep up to 06 years or 2,50,000 kms. and registration in taxi quota for official/field use of ee (eht-m) dn., mpptcl, jabalpur
Hiring of latest model-2025 of 1 no. new jeep (6plus1 seater) sel or utilization period of jeep up to 06 years or 2,50,000 kms. and registration in taxi quota for official/field use of ee (eht-m) dn., mpptcl, jabalpur
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConsultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSs of crushed s/aggs of various size and s/dust (dry) b/w km 38.00 to km 45.79 on r-r-k road for pmt work (approx 50 percentage qty) under 130 rcc/764 brtf (p) swastik in sikkim job no 309/289.
Ss of crushed s/aggs of various size and s/dust (dry) b/w km 38.00 to km 45.79 on r-r-k road for pmt work (approx 50 percentage qty) under 130 rcc/764 brtf (p) swastik in sikkim job no 309/289.
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreAAAAAAAAAA
Login to viewConstruction of septic tank behind typer-iii qtr. no. ac-01 to 06 (05 users), construction of inspection chamber for sewage line of type-i qtr. and special repair work of typer-iii, type-ii and type-i block at alhw residential colony, brookshabad in
Read moreConstruction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Read moreConstruction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle
Read moreof your Industry type