Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Hiring Of Services For Environment Impact Assessment Rapid Risk Assessmen
|
| Description |
|
| Organisation | NUMALIGARH REFINERY Limited | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5191358 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 24, 2024 14:28 |
| End Date |
Expired
07/08/2024
Expired 795 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Integrated hydrogeological investigations including ground water impact assessment andrenewal of noc for extraction of ground water
Integrated hydrogeological investigations including ground water impact assessment at all 6 chilling centre premises of bamul and at hosakote dairy -including water audit and submission of application and other documents to karnataka state ground water authority renewal of noc for extraction of ground water from existing borewell at all 6 chilling centre premises of bamul and at hosakote dairy from karnataka state ground water authority
Read moreRequest for proposal for appointment of consultant for financial assessment, institutional diagnosis and comprehensive revival strategy
Request for proposal for appointment of consultant for financial assessment, institutional diagnosis and comprehensive revival strategy
Read moreSupply of coal and sand filter media for rapid gravity sand filters of water systems
Supply of coal and sand filter media for rapid gravity sand filters of water systems
Read moreSelection of an agency for ui and ux assessment, redesign and implementation support of government digital platforms telangana -2nd call
Selection of an agency for ui and ux assessment, redesign and implementation support of government digital platforms telangana -2nd call
Read moreSelection of an implementation vendor for design development deployment and manage support of an ai/ml based gst risk analytics platform
Selection of an implementation vendor for design development deployment and manage support of an ai/ml based gst risk analytics platform
Read moreRequest for selection of consultant for the preparation of dpr for selection of suitable tube well sites, determination of pump capacity, assessment of water quality, required, electricity and related infrastructure and technical study of the proposed water supply system in biharsharif.
Request for selection of consultant for the preparation of dpr for selection of suitable tube well sites, determination of pump capacity, assessment of water quality, required, electricity and related infrastructure and technical study of the proposed water supply system in biharsharif.
Read moreEstimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreof your Industry type