Tender Details

Particulars Details
Title
Estimate For Rehabilitation/Remodeling Of W/C Outlet Rd 25843/L Ludana Minor
Description
Estimate For Rehabilitation/Remodeling Of W/C Outlet Rd 25843/L Ludana Minor
Organisation Government of Haryana
Tender Id 2023_HRY_312919_1
Reference
Number
202325606707 5348 4E84 8A66 1B19D923D522149IRR
Tender Fee 2500
EMD 58060
Tender Value
Place Const. Divn. No.19 Rohtak
Link https://etenders.hry.nic.in
Start Date September 20, 2023 23:30
End Date

27/09/2023 ( Expired 647 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Water locking unit (c&w item)

For complete deion and other details, please refer to tender

Read more
Design and constrn of 02 nos various span major minor pmt bridges on open fdn with steel superstructure through type steel girder type and 01 nos of sub structure for modular bridge incl ssi incl approach rd at km 75.98, 78.00 and km 82.35 on npd rd

Design and constrn of 02 nos various span major minor pmt bridges on open fdn with steel superstructure through type steel girder type and 01 nos of sub structure for modular bridge incl ssi incl approach rd at km 75.98, 78.00 and km 82.35 on npd rd

Read more
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana

Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana

Read more
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26

Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period

Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise