Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cost Of Construction Of Fire Break Along The Kalakidannan Nemmara Division Boundary Padukutty At Muthuvarachal Section
|
| Description |
Cost Of Construction Of Fire Break Along The Kalakidannan Nemmara Division Boundary Padukutty At Muthuvarachal Section
|
| Organisation | Government of Kerala |
| Tender Id | 2023_FD_634927_23 |
|
Reference Number |
A1-4971/2023 |
| Tender Fee | 500 |
| EMD | 2575 |
| Tender Value | |
| Place | Parambikulam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | December 22, 2023 22:30 |
| End Date |
Expired
03/01/2024
Expired 903 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency on the basis of competitive bidding through e-tender at sathyagala fee plaza at design km 359.800 of brt tiger reserve boundary to bangalore section of nh209 in the state of karnataka
Engagement of user fee agency on the basis of competitive bidding through e-tender at sathyagala fee plaza at design km 359.800 of brt tiger reserve boundary to bangalore section of nh209 in the state of karnataka
Read moreInstallation of false ceiling in despatch section, cash section, acs department, ree (blasting) division and wall panelling, vertical blinds at despatch section at csir-cimfr, hq dhanbad.
Installation of false ceiling in despatch section, cash section, acs department, ree (blasting) division and wall panelling, vertical blinds at despatch section at csir-cimfr, hq dhanbad.
Read moreConstruction of 145 boundary pillars at julla forest in katra range of demarcation as per approved design at different locations as per tashree burjiat (deion of boundary pillar) of reasi forest division under ut capex 2026-27
Construction of 145 boundary pillars at julla forest in katra range of demarcation as per approved design at different locations as per tashree burjiat (deion of boundary pillar) of reasi forest division under ut capex 2026-27
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRestoration of the fire fighting system including replacement of the defective 1.1 kv lt power cable from ess to the fire pump house with allied works at icp jogbani bihar.
Restoration of the fire fighting system including replacement of the defective 1.1 kv lt power cable from ess to the fire pump house with allied works at icp jogbani bihar.
Read moreSpecial repairing of field section, pump house, battery, office rooms, providing 05 nos. structural steel gate at main entrance, renovation of damaged boundary wall at side of dumper section of excavation workshop of socp under ibva (1st re-tender)
Special repairing of field section, pump house, battery, office rooms, providing 05 nos. structural steel gate at main entrance, renovation of damaged boundary wall at side of dumper section of excavation workshop of socp under ibva (1st re-tender)
Read moreWork regarding the installation of a boundary wall and gate at the cand d collection center in ambedkar nagar
Work regarding the installation of a boundary wall and gate at the cand d collection center in ambedkar nagar
Read moreSupplying contract jeep having capacity above 1500cc with driver for a period of one year for the use of electrical section amboori under electrical division kattakada
Supplying contract jeep having capacity above 1500cc with driver for a period of one year for the use of electrical section amboori under electrical division kattakada
Read moreReconstruction of damaged boundary wall facing seaside at 7m detachment okha under ge (navy) porbandar
Reconstruction of damaged boundary wall facing seaside at 7m detachment okha under ge (navy) porbandar 
Read moreof your Industry type