Tender Details

Particulars Details
Title
Irqp Work Of Patratu To Saunda D Road From Km0.00 To 11.35 Under Road Divison, Ramgarh For The Year 2023 24
Description
Irqp Work Of Patratu To Saunda D Road From Km0.00 To 11.35 Under Road Divison, Ramgarh For The Year 2023 24
Organisation RCD EinC | State Govt. and UT
Tender Id 2024_CECOM_82206_1
Reference
Number
RCD/RAMGARH/75/2023-24 (2ND CALL)
Tender Fee 10000
EMD 6.18 Lakh
Tender Value
Place Patratu to Saunda-D Road from KM 0.00 to 11.35
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=110021
Start Date February 05, 2024 16:00
End Date

12/02/2024 ( Expired 495 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise