Particulars | Details |
---|---|
Title |
Supply For Construction Of Composit Rings Mains In 11/L.T. Line From Parwati Choki To Rai Pull Under Edsd, Pithoragarh
|
Description |
Supply For Construction Of Composit Rings Mains In 11/L.T. Line From Parwati Choki To Rai Pull Under Edsd, Pithoragarh
|
Organisation | MD - UPCL | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 20000 |
Tender Value | |
Place | PITHORAGARH |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 20:30 |
End Date |
23/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for construction of jharsuguda bypass including rob including land acquisition on nh-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of odisha.
Consultancy services for construction of jharsuguda bypass including rob including land acquisition on nh-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of odisha.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreTower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreProviding gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Providing gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreProviding gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreof your Industry type