Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
A/Mtc. Of Ashiyana Scheme In Sector 4(extn.), U/E Rohtak
|
Description |
Removing Of Silt From Existing Sewerage Manholes Of Size 5 X 3 At Various Location And Cleaning Of Choked/ Semi Choked Sewerage Lines Of Various Sizes With Bucket Type Sewer Cleaning Machine In Ashiyana Scheme
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1430 |
EMD | 3960 |
Tender Value | |
Place | The Executive Engineer HSVP Division No. I, Rohtak |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 22:30 |
End Date |
08/07/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreLicensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical 
 college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Read morePerformance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Read moreExternal finishing works of cisf colony at sector 4, dsiidc bawana
External finishing works of cisf colony at sector 4, dsiidc bawana
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreof your Industry type