Tender Details

Particulars Details
Title
Improvement To The Distribution System(d/S) Of Latkanpada Mip In Komna Block Of Nuapada District Under Erm Scheme 2024 25
Description
Improvement To The Distribution System(d/S) Of Latkanpada Mip In Komna Block Of Nuapada District Under Erm Scheme 2024 25
Organisation CE,Minor Irrigation,BBSR | State Govt. and UT
Tender Id 2025_CEMIB_113099_2
Reference
Number
01/SE MIDKHR/2025-26
Tender Fee 6000
EMD 14550
Tender Value
Place Komna
Link https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=538371
Start Date May 05, 2025 15:30
End Date

14/05/2025 ( Expired 38 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Construction of mountain museum and planetarium,under member of parliament local area development scheme in pauri constituency of pauri block of pauri garhwal

Construction of mountain &amp#x0d museum and &amp#x0d planetarium,under member of &amp#x0d parliament local area &amp#x0d development scheme in pauri &amp#x0d constituency of pauri block of &amp#x0d pauri garhwal &amp#x0d

Read more
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
Strengthening of 36.00m wide road

Strengthening of 36.00m wide road in sector-1, chanakyapuri to prevesh vihar and strengthening of 30.00m wide road oht chauraha, sector 3 to meerut nala under ht line and strengthening of roads in block a and block b of somdutt city in scheme no. 11,

Read more
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

Read more
Geometric improvement and restoration work of syari cooperative to ranipool alternate highway under gangtok district, sikkim (8.70 km).

Geometric improvement and restoration work&amp#x0d of syari cooperative to ranipool alternate&amp#x0d highway under gangtok district, sikkim (8.70&amp#x0d km).

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise