Particulars | Details |
---|---|
Title |
Fabrication / Erection And Replacement Of Take Up Drum Structure And Repairing / Replacement Of Column Er Weight Body Structure Of 51 B/C And Slurry Bypass B/C Of Main Plant Section At Sawang Washery.
|
Description |
Fabrication / Erection And Replacement Of Take Up Drum Structure And Repairing / Replacement Of Column Er Weight Body Structure Of 51 B/C And Slurry Bypass B/C Of Main Plant Section At Sawang Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_310359_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/39 Date 13.06.2024 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321589 |
Start Date | June 14, 2024 16:30 |
End Date |
24/06/2024 ( Expired 372 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Off-loading mechanical works of main washery plant of pump and slurry circuit at main plant of kedla washery under hazaribagh area.
Off-loading mechanical works of main washery plant of pump and slurry circuit at main plant of kedla washery under hazaribagh area. 
 
Read moreErection and strengthening of overhead line, damaged pole, conductor etc. at around plant and colony of sawang washery as and when damaged from storm, rain and other reasons.
Erection and strengthening of overhead line, damaged pole, conductor etc. at around plant and colony of sawang washery as and when damaged from storm, rain and other reasons.
Read moreDismantling of take-up drum size 1600 x 1000 x 10mm, tail snub drum size 1600 x 400 x 10mm then repairing and installation of the same including repairing of its supporting structure of unit no. 950 b/c in rlb section of kathara washery
Dismantling of take-up drum size 1600 x 1000 x 10mm, tail snub drum size 1600 x 400 x 10mm then repairing and installation of the same including repairing of its supporting structure of unit no. 950 b/c in rlb section of kathara washery
Read more(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
Read moreDismantling, fabrication/erection of double roll crusher outer cover, feed chute, discharge chute and platform gate work in main washing plant of sawang washery.
Dismantling, fabrication/erection of double roll crusher outer cover, feed chute, discharge chute and platform gate work in main washing plant of sawang washery.
Read moreRepairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Repairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Read moreA)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
A)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
Read moreA)repairing, of shaft for 8 gay pump of unit no. 652 and 653 b)complete repairing and overhauling of pedestal for 8 gay pump in unit no. 652 and standby in the fine coal section at kathara washery
A)repairing, of shaft for 8 gay pump of unit no. 652 and 653 b)complete repairing and overhauling of pedestal for 8 gay pump in unit no. 652 and standby in the fine coal section at kathara washery
Read moreFabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Read moreRepairing and thorough overhauling of take-up drum u-1200 gear box of unit no. 66 belt conveyor and secondary double roll crusher in gear box sen-280 in raw coal section of kathara washery
Repairing and thorough overhauling of take-up drum u-1200 gear box of unit no. 66 belt conveyor and secondary double roll crusher in gear box sen-280 in raw coal section of kathara washery