Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Procurement Opportunity: Usl Screen Fabrication And Installation 🏗️ Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Fabrication, Erection, And Replacement Of A Usl Screen In The S 2 Slurry Screen At The Main Plant Located At Sawang Washery. 📅 Bid Submission Deadline: May 30, 2024, 11:00 Am The Tender Fee Is Non Refundable Inr 5400. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, By The Stipulated Date And Time. Keywords: Fabrication, Erection, Replacement, Usl Screen, S 2 Slurry Screen, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid, Sawang Washery| Particulars | Details |
|---|---|
| Title |
Fabrication / Erection And Replacement Of Usl Screen In S 2 Slurry Screen In Main Plant At Sawang Washery.
|
| Description |
Fabrication / Erection And Replacement Of Usl Screen In S 2 Slurry Screen In Main Plant At Sawang Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_308461_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/06 Date 18.05.2024 |
| Tender Fee | 0 |
| EMD | 5400 |
| Tender Value | |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319627 |
| Start Date | May 20, 2024 16:30 |
| End Date |
Expired
30/05/2024
Expired 766 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair/ replacement of main filtration plant at upper gorkha camp including distribution pipe lines and connected items at wellington area under ge wellington
Repair/ replacement of main filtration plant at upper gorkha camp including distribution pipe lines and connected items at wellington area under ge wellington
Read moreSupply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Supply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Read moreRate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Rate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Read moreRepair or replacement of existing unserviceable distribution boards with mcbs db box sub main wiring services connections and other connected repair or replacement of internal wiring point wiring and other connected works
Rrepair or replacement of existing unserviceable distribution boards with mcbs db box sub main wiring services connections and other connected repair or replacement of internal wiring point wiring and other connected works
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreRepairs/replacement of sewage line, cleaning of sewage line and repairs to drain, culvert, sunken floor, compound wall/boundary wall at certain location at zone-1 and 1a under ge (s) tezpur
Repairs/replacement of sewage line, cleaning of sewage line and repairs to drain, culvert, sunken floor, compound wall/boundary wall at certain location at zone-1 and 1a under ge (s) tezpur
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreDesign, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Design, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Read morePreparation of detailed project report (dpr) and tender documents for selection of an agency for construction of 5 mtpa coal washery at manoharpur coal mines
Preparation of detailed project report (dpr) and tender documents for selection of an agency for construction of 5 mtpa coal washery at manoharpur coal mines
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreof your Industry type