Tender Details

Particulars Details
Title
Dnit For Preparation Of Detailed Project Report I/C Complete Drawings Gad And Soil Testing For The Construction Of Rob At Lc 57 C On Hisar Jakhal Railway Line At Rly Km 75 / 14 15 On Hisar Railway Road ( Road Id 4846 ) In Hisar Distt.
Description
Dnit For Preparation Of Detailed Project Report I/C Complete Drawings Gad And Soil Testing For The Construction Of Rob At Lc 57 C On Hisar Jakhal Railway Line At Rly Km 75 / 14 15 On Hisar Railway Road ( Road Id 4846 ) In Hisar Distt.
Organisation Haryana Government | State Govt. and UT
Tender Id 2026_HRY_519581_1
Reference
Number
202655F1C1E7 5BAD 4801 B259 21C4D42F51ED629BAR
Tender Fee 2000
EMD 33100
Tender Value -
Place RAIPUR RAIPUR RAIPUR Hisar
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=598477

Start Date May 06, 2026 14:30
End Date
Expired 12/05/2026

Expired 157 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)

Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)

Read more
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway

Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway

Read more
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.

Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.

Read more
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.

Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.

Read more
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Read more
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Read more
Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.

Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.

Read more
Trd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .

Trd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .

Read more
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in

Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in

Read more
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise