Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Construction Opportunity: 4 Lane Rob At Surewala Chowk 🌉 The Haryana Government Invites Tenders From Experienced Contractors For The Construction Of A 4 Lane Road Over Bridge (Rob) On The Surewala Chowk To Uklana Bhuna Road At Km 4.415, Lc No. B 25/2, On The Jakhal Hisar Railway Line At Railway Km 34/0 At Hansi, Distt. Hisar. 📅 Bid Submission Deadline: April 03, 2024, 5:00 Pm Tender Fee: Inr 16,180 Earnest Money Deposit (Emd): Inr 32,80,190 This Project Includes The Pedg. Shifting Of Ht/Lt Lines Only. Interested Bidders Must Submit Detailed Tenders, Including Technical And Financial Bids, In Accordance With The Specifications And Guidelines Provided In The Tender Document. Keywords: Construction, Road Over Bridge, Rob, Haryana Government, Infrastructure Project, Tender, Bid Submission, Emd, Hansi, Hisar District| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Lane Rob On Surewala Chowk To Uklana Bhuna Road Km 4.415 At Lc No. B 25/2 On Jakhal Hisar Railway Line At Railway Km 34/O At Hansi In Distt. Hisar ( Pdg. Shifting Of Ht/Lt Lines Only)
|
| Description |
Construction Of 4 Lane Rob On Surewala Chowk To Uklana Bhuna Road Km 4.415 At Lc No. B 25/2 On Jakhal Hisar Railway Line At Railway Km 34/O At Hansi In Distt. Hisar ( Pdg. Shifting Of Ht/Lt Lines Only)
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_368618_1 |
|
Reference Number |
2024F0FC9E04 D4AA 4016 9F9D F63C6F2383D9666BAR |
| Tender Fee | 16180 |
| EMD | 3.28 Lakh |
| Tender Value | - |
| Place | Uklana Mandi |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=444334 |
| Start Date | March 14, 2024 22:00 |
| End Date |
Expired
03/04/2024
Expired 926 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Read moreConstruction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Read moreRob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreCarrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Read moreDesign, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Read moreTrd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Trd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreof your Industry type