Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1) Extension Of Line No 4 By Shifting Of Point And Crossover No. 112 A/B Towards Bje End To Get Full Length Csl At Santhaldih Station In Adra Division.2) Kotshila Bokaro Steel City Ttr(cscmsc) 127sets And Ttr(ds) 4 Sets.3)renewal Of 56 Nos. Of Sej 4)adra Division Ttr(tfr) 95 Sets, Ttr(tsr) 15 Sets And Ttr(twswcmsc) 24 Sets 5)tfr Between Rui Bje 1.761 Tr. Km, Ksx Bksc 4.05 Tr. Km And Renewal Of Grsp From Km 326.038 To 345.279km (29515 Nos.) 6) Renewal Of Ordinary Cms Crossing Under The Juri
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78803777 |
|
Reference Number |
E-DRM-Engg-ADRA-166-24 |
| Tender Fee | 0 |
| EMD | 3.04 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78803777/viewNitPdf_4794300.pdf |
| Start Date | December 04, 2024 22:36 |
| End Date |
Expired
27/12/2024
Expired 659 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(1) renewal of cmsc to wcmsc - 130 sets [planned basis] & (2) ttr(tws + wcmsc)-18 sets (main line) & 34 set (loop line), ttr(wcmsc)-38 sets & ttr(ds)- 8 sets.
(1) renewal of cmsc to wcmsc - 130 sets [planned basis] & (2) ttr(tws + wcmsc)-18 sets (main line) & 34 set (loop line), ttr(wcmsc)-38 sets & ttr(ds)- 8 sets.
Read moreMakholi-mathura section - trr(p) - 4.307 kms with 60kg rails, ttr(fs) - 06 sets, tfr - 11.604 kms and tfr(r) - 1.934 kms.
Makholi-mathura section - trr(p) - 4.307 kms with 60kg rails, ttr(fs) - 06 sets, tfr - 11.604 kms and tfr(r) - 1.934 kms.
Read moreI).rangiya jn.-north lakhimpur- tfr on loop lines- 39.556 tkm.(project id:08.04.31.26.3.53.009. ii)yard improvement- rangiya jn.-rangapara north -ttr(fs+tws+wcms)- 6 sets(1:12)& ttr(tws+wcms)-28 sets(1:12)(project id:08.04.31.26.3.53.008)
I).rangiya jn.-north lakhimpur- tfr on loop lines- 39.556 tkm.(project id:08.04.31.26.3.53.009. ii)yard improvement- rangiya jn.-rangapara north -ttr(fs+tws+wcms)- 6 sets(1:12)& ttr(tws+wcms)-28 sets(1:12)(project id:08.04.31.26.3.53.008)
Read moreRail bonding work in connection with track renewal in bly-bdc-skg-ttr 30 sets(60 kg 1 in 12) ttr (fs+tws+wcmsc)-40 sets (60 kg 1 in 12) and d/xing (dsd,ssd & td)- 18 sets (60 kg 1 in 8.5), ttr (fs+tws+wcmsc) -105 sets (60 kg 1 in 8.5 ), tftr-3.008 tkm in howrah division of eastern railway.
Rail bonding work in connection with track renewal in bly-bdc-skg-ttr 30 sets(60 kg 1 in 12) ttr (fs+tws+wcmsc)-40 sets (60 kg 1 in 12) and d/xing (dsd,ssd & td)- 18 sets (60 kg 1 in 8.5), ttr (fs+tws+wcmsc) -105 sets (60 kg 1 in 8.5 ), tftr-3.008 tkm in howrah division of eastern railway.
Read more(1) ttr(wcmsc)- 02 sets in knhn-rtk d route & ttr (wcmsc)- 79 sets in kt-ngp a route under the jurisdiction of aden/tr./nagpur, (2) tbr 15.437 kms of passenger running loop lines of a route under the jurisdiction of aden/tr./nagpur, (3) nitr-kt-ttr (tws+wcmsc) - 37 sets & ds - 20 sets from 52 kg to 60kg under the jurisdiction of aden/tr./nagpur. and (4)through turnout sleeper renewal at various yards under the jurisdiction of aden/tr./nagpur.
(1) ttr(wcmsc)- 02 sets in knhn-rtk d route & ttr (wcmsc)- 79 sets in kt-ngp a route under the jurisdiction of aden/tr./nagpur, (2) tbr 15.437 kms of passenger running loop lines of a route under the jurisdiction of aden/tr./nagpur, (3) nitr-kt-ttr (tws+wcmsc) - 37 sets & ds - 20 sets from 52 kg to 60kg under the jurisdiction of aden/tr./nagpur. and (4)through turnout sleeper renewal at various yards under the jurisdiction of aden/tr./nagpur.
Read more(a)nagpur division casual renewal of cs, cms, tws, ds & ttr(tfr),(b)nagpur division-casual renewal of rails=3.33kms & casual renewal of sleeper=3.33 kms.(c)nagpur division-replacement of overaged sej by twsej-42 sets.(d)ttr(fs+tws+wcmsc)=14nos (1 in 8.5=9nos, 1 in 12=5nos) g.total=14 nos in branch lines of ngp division.(e)proposed tbr from (a)-1)kms 811.00-818.00=7.00kms-sl,2)kms 840.786-841.000=0.214 kms-sl, total=7.214 kms in butibori-umred section,(b)-1)kms 1041.00-1041.600=0.600kms
(a)nagpur division casual renewal of cs, cms, tws, ds & ttr(tfr),(b)nagpur division-casual renewal of rails=3.33kms & casual renewal of sleeper=3.33 kms.(c)nagpur division-replacement of overaged sej by twsej-42 sets.(d)ttr(fs+tws+wcmsc)=14nos (1 in 8.5=9nos, 1 in 12=5nos) g.total=14 nos in branch lines of ngp division.(e)proposed tbr from (a)-1)kms 811.00-818.00=7.00kms-sl,2)kms 840.786-841.000=0.214 kms-sl, total=7.214 kms in butibori-umred section,(b)-1)kms 1041.00-1041.600=0.600kms
Read more(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
Read more(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
Read more(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
Read moreMs-vm section :manufacture and supply of welding portions for 52/60 kg rails for various track works in sr.den/south/mas jurisdiction. 1) ms-vm section: trr(p)-1.472 km 2) ms-vm section: tsr(p)-11.755 km 3) ms-vm section: trr (s)-3.260 km 4) ms-vm section: tsr(s)-5.334 km 5) ms-vm section: ttr-115 sets 6) ms-vm section: ttr- 87 sets 7) ms-vm section: twr-12.50 km 8) ms-vm section: renewal of sejs- 16 sets, glued joints - 4 sets & improved sej - 52kg- 6 set 9)ms-vm section: trr 10.00
Ms-vm section :manufacture and supply of welding portions for 52/60 kg rails for various track works in sr.den/south/mas jurisdiction. 1) ms-vm section: trr(p)-1.472 km 2) ms-vm section: tsr(p)-11.755 km 3) ms-vm section: trr (s)-3.260 km 4) ms-vm section: tsr(s)-5.334 km 5) ms-vm section: ttr-115 sets 6) ms-vm section: ttr- 87 sets 7) ms-vm section: twr-12.50 km 8) ms-vm section: renewal of sejs- 16 sets, glued joints - 4 sets & improved sej - 52kg- 6 set 9)ms-vm section: trr 10.00
Read moreof your Industry type