Tender Details
Particulars | Details |
---|---|
Title |
Nit 05, Sl 08
|
Description |
Construction Of Pcc Road From The House Of Mir Rabbul To The House Of Mir Daras At Pathanpara Samsad Ix Untied Under Mathurapur Gram Panchayat In Manikchak Dev. Block, Malda
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2025_ZPHD_840590_9 |
Reference Number |
05/MGP/2025, Dated-29-04-2025 |
Tender Fee | 250 |
EMD | 1925 |
Tender Value | |
Place | UNDER MATHURAPUR GP |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1874586 |
Start Date | May 01, 2025 00:25 |
End Date |
08/05/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Land slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh
Land slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreCon cc road ward 05 bypass to near sundar rajak culvert
Con cc road ward 05 bypass to near sundar rajak culvert
Read moreKmda/gap/se(n)/niq-03(2nd call)/25-26 sl no 01
Preparation of detailed gis based project report for howrah added zone in i and d with stp/fstp basis for interception of 5 nos. polluted khals i.e.n. c. pal khal, singhi more khal, ,sankrail khal, sarenga canal and nazirganj khal.
Read moreKmda/gap/se(n)/niq-03(2nd call)/25-26 sl no 02
Preparation of gis based detailed project report (dpr) for pollution abatement sewerage project (interception&#x0d and di with stp/fstp) at uluberia municipal town in west bengal.
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of 4 nos back-hoe&#x0d loader and 2 nos. 6 wheel dumper use for garbage collection for five years&#x0d
Read moreConstruction of bituminous road at nand gaon ward no.25 sector no.04-05
Construction of bituminous road at nand gaon ward no.25 sector no.04-05
Read moreE-nit no.33/2025-26/nirman storm water
Storm water drainage work with 5 years defect liability period and 10 years operation and maintenance in bikaner.
Read moreof your Industry type