Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Short Term Maintenance And Routine Maintenance Of Stretch From Design Km 0.000 To Design Km 125.300 Excluding Mnp Stretch From Design Km 100.757 To 107.350 Of Four Lane Of Gwalior Shivpuri Section Of Nh 46 In The State Of Mp
|
| Description |
Short Term Maintenance And Routine Maintenance Of Stretch From Design Km 0.000 To Design Km 125.300 Excluding Mnp Stretch From Design Km 100.757 To 107.350 Of Four Lane Of Gwalior Shivpuri Section Of Nh 46 In The State Of Mp
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_208919_1 |
|
Reference Number |
NHAI/ROMP/Gwalior/GWL Shiv/NH 46/2024 |
| Tender Fee | 50000 |
| EMD | 22.06 Lakh |
| Tender Value | - |
| Place | NHAI RO Bhopal |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=228483 |
| Start Date | September 20, 2024 23:50 |
| End Date |
Expired
25/10/2024
Expired 718 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement of riding quality and routine maintenance with other ancillary work, safety work etc. of existing gwalior shivpuri section of nh 46 from km 00.000 to km 125.380 (excluding 100.757 to 107.350) in state of mp
Improvement of riding quality and routine maintenance with other ancillary work, safety work etc. of existing gwalior shivpuri section of nh 46 from km 00.000 to km 125.380 (excluding 100.757 to 107.350) in state of mp
Read moreDesign and reconstruction of re wall approaches of rob at km 109.900 and 121.045 in shivpuri bypass of gwalior-shivpuri section of nh-46 in the state of madhya pradesh on epc mode
Design and reconstruction of re wall approaches of rob at km 109.900 and 121.045 in shivpuri bypass of gwalior-shivpuri section of nh-46 in the state of madhya pradesh on epc mode
Read moreRoutine maintenance including incident management (excluding ambulance services) of 2l with paved shoulders from ibrahimpatnam circle (km 0.000) to ap/telangana border (km 70.190) of nh-30 (excluding ramachandrapuram town limits from km 37.950 to km
Routine maintenance including incident management (excluding ambulance services) of 2l with ps from ibrahimpatnam circle (km 0.000) to ap/telangana border (km 70.190) of nh-30 (excluding ramachandrapuram town limits km 37.950 - km 38.950) in the ap.
Read moreRoutine maintenance of two laning with paved shoulder of chhapra - gopalganj section of nh-85 from km 0.000 to km 93.500 (existing chainage) and km. 0.000 to km. 94.258 (design chainage), (total design length 94.258 kms.) in the state of bihar
Routine maintenance of two laning with paved shoulder of chhapra - gopalganj section of nh-85 from km 0.000 to km 93.500 (existing chainage) and km. 0.000 to km. 94.258 (design chainage), (total design length 94.258 kms.) in the state of bihar
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreShort term maintenance contract stmc work within stretch from km. 0.000 to km. 25.500 excluding km 8.660 to km. 9.370 and km. 20.400 to km. 21.500 and km. 41.00 to km. 64.70 excluding km. 62.900 to km. 63.49 of nh116b in the district of purba medinip
Short term maintenance contract stmc work within stretch from km. 0.000 to km. 25.500 excluding km 8.660 to km. 9.370 and km. 20.400 to km. 21.500 and km. 41.00 to km. 64.70 excluding km. 62.900 to km. 63.49 of nh116b in the district of purba medinip
Read moreConstruction of 6 lane access controlled greenfield corridor from agra to gwalior from design ch.0.000 km to design ch.36.800 km (package-i) under nh(o) scheme in the state of uttar pradesh rajasthan on ham mode
Construction of 6 lane access controlled greenfield corridor from agra to gwalior from design ch.0.000 km to design ch.36.800 km (package-i) under nh(o) scheme in the state of uttar pradesh rajasthan on ham mode
Read morePeriodical renewal of zira ferozepur road sh 20 from km 0.000 to 34.555 excluding 400 m stretch for the financial year 2024-25 including maintenance of road for 5 year one year defect liability period plus four year maintenance period
Periodical renewal of zira ferozepur road sh 20 from km 0.000 to 34.555 excluding 400 m stretch for the financial year 2024-25 including maintenance of road for 5 year one year defect liability period plus four year maintenance period
Read morePeriodical renewal of zira ferozepur road sh 20 from km 0.000 to 34.555 excluding 400 m stretch for the financial year 2024-25 including maintenance of road for 5 year one year defect liability period plus four year maintenance period
Periodical renewal of zira ferozepur road sh 20 from km 0.000 to 34.555 excluding 400 m stretch for the financial year 2024-25 including maintenance of road for 5 year one year defect liability period plus four year maintenance period
Read moreRoutine maintenance including incident management (excluding ambulance services) for four laning of vijayawada-machilipatnam section of nh-65 from km 0.000 to km 64.611 and eastern side benz circle flyover on nh-16 in the state of ap.
Routine maintenance including incident management (excluding ambulance services) for four laning of vijayawada-machilipatnam section of nh-65 from km 0.000 to km 64.611 and eastern side benz circle flyover on nh-16 in the state of ap.
Read moreof your Industry type