Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Design And Reconstruction Of Rob Approaches 🏗️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Invites Bids From Eligible Contractors For The Design And Reconstruction Of Reinforced Earth (Re) Wall Approaches Of A Road Over Bridge (Rob) On The Gwalior Shivpuri Section Of National Highway 46 In Madhya Pradesh. 📍 Location: Nhai Ro Jabalpur Bid Submission Deadline: April 30, 2024, 2:00 Pm Tender Fee: Inr 10,000 Emd: Inr 3,69,944.20 This Project Will Be Executed On An Engineering, Procurement, And Construction (Epc) Basis. Interested Bidders Must Submit Detailed Proposals, Including Design Specifications, Construction Methodology, And Financial Bids, Adhering To The Tender Documents And Guidelines. Keywords: Nhai, Epc Mode, Road Over Bridge, Reinforced Earth Wall, Approaches, Infrastructure Development, Public Sector Undertaking, Tender, Bid Submission, Madhya Pradesh, National Highway 46| Particulars | Details |
|---|---|
| Title |
Design And Reconstruction Of Re Wall Approaches Of Rob At Km 109.900 And 121.045 In Shivpuri Bypass Of Gwalior Shivpuri Section Of Nh 46 In The State Of Madhya Pradesh On Epc Mode
|
| Description |
Design And Reconstruction Of Re Wall Approaches Of Rob At Km 109.900 And 121.045 In Shivpuri Bypass Of Gwalior Shivpuri Section Of Nh 46 In The State Of Madhya Pradesh On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_191492_1 |
|
Reference Number |
NHAI/RO-JBP/Gwalior Shivpuri/ROB/ EPC/2024 |
| Tender Fee | 10000 |
| EMD | 36.99 Lakh |
| Tender Value | - |
| Place | NHAI RO JABALPUR |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=209665 |
| Start Date | March 15, 2024 19:30 |
| End Date |
Expired
20/08/2024
Expired 784 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreConstruction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling west bengal on epc mode under nh(o)
Construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling west bengal on epc mode under nh(o)
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Read moreConstruction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreStmc work on nh-56 old nh-113, pratapgarh-padi section and construction of 2 lane road in forest area, km 38/100-43/040, 46/500-47/080 and 51/640-54/500, nh-113 on epc mode, rajasthan
Stmc work on nh-56 old nh-113, pratapgarh-padi section and construction of 2 lane road in forest area, km 38/100-43/040, 46/500-47/080 and 51/640-54/500, nh-113 on epc mode, rajasthan
Read moreof your Industry type