Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Modular Replacement Of Boiler Hot Reheat Coil Assemblies 89 Nos Including Hrh Outlet Header Nipples With Higher Grade Material For 210 Mw Bhel Make Boiler In Unit Iv Of Mtpsi 2 Items
|
| Description |
Modular Replacement Of Boiler Hot Reheat Coil Assemblies 89 Nos Including&Amp#X0d
Hrh Outlet Header Nipples With Higher Grade Material For 210 Mw Bhel&Amp#X0d
Make Boiler In Unit Iv Of Mtpsi 2 Items
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_631063_1 |
|
Reference Number |
CE/ MTPSI / SE / PA / EE / SI / AEE2 / OTNo 116/ 2025_ 26 |
| Tender Fee | 0 |
| EMD | 11.28 Lakh |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=754710 |
| Start Date | December 11, 2025 19:30 |
| End Date |
Expired
19/01/2026
Expired 269 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - biennial rate contract of boiler and boiler auxiliaries of unit#210 mw and 250 mw, mtps, dvc
Custom bid for services - biennial rate contract of boiler and boiler auxiliaries of unit#210 mw and 250 mw, mtps, dvc
Read moreProcurement of paph air outlet damper and hot primary air control damper installed at boiler of 1x500 mw unit, sgtps, mppgcl, birsinghpur.
Procurement of paph air outlet damper and hot primary air control damper installed at boiler of 1x500 mw unit, sgtps, mppgcl, birsinghpur.
Read more757/p-3/emp-13345 dt. 25.09.2026 for overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Read moreBiennial contract for routine preventive scheduled breakdown maintenance of boiler pressure part and non pressure part auxiliaries including coal mills of ph i and ii 4 x 210 mw, at sgtps, mppgcl, birsinghpur.
Biennial contract for routine preventive scheduled breakdown maintenance of boiler pressure part and non pressure part auxiliaries including coal mills of ph i and ii 4 x 210 mw, at sgtps, mppgcl, birsinghpur.
Read moreTesting of safety valve installed at boiler side on boiler drum, water separator equalizing line, main steam line, cold reheat line (crh), hot reheat line (hrh)and soot blower station by online valtest method at sstpp
Testing of safety valve installed at boiler side on boiler drum, water separator equalizing line, main steam line, cold reheat line (crh), hot reheat line (hrh)and soot blower station by online valtest method at sstpp
Read moreTn-5272 dismantling and erection of hrh coils and removal of partition plate from hrh header of unit 6 (195 mw) stage-iv kstps, kota
Dismantling and erection of hrh coils and removal of partition plate from hrh header of unit 6 (195 mw) stage-iv kstps, kota
Read moreChemical cleaning of boiler during the overhauling of boiler of 210 mw unit 6 ptps panipat
Chemical cleaning of boiler during the overhauling of boiler of 210 mw unit 6 ptps panipat
Read moreResidual life assessment study of unit-4 boiler (210 mw abl make)
Residual life assessment study of unit-4 boiler (210 mw abl make)
Read moreof your Industry type