Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Testing Of Safety Valve Installed At Boiler Side On Boiler Drum, Water Separator Equalizing Line, Main Steam Line, Cold Reheat Line (Crh), Hot Reheat Line (Hrh)and Soot Blower Station By Online Valtest Method At Sstpp
|
| Description |
Testing Of Safety Valve Installed At Boiler Side On Boiler Drum, Water Separator Equalizing Line, Main Steam Line, Cold Reheat Line (Crh), Hot Reheat Line (Hrh)and Soot Blower Station By Online Valtest Method At Sstpp
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_MPPGC_294860_1 |
|
Reference Number |
WT-2050 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | III Floor Admin Building SSTPP |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | August 05, 2023 19:00 |
| End Date |
Expired
14/08/2023
Expired 1158 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Disc, separator safety valve,disc, ms safety valve,disc, hrh safety valve,disc, crh safety valve,up
Read more
Custom bid for services - online safety valve setting by valtest method for boiler of ctps unit 78
Read more
Procurement of graphite braided gasket for crh and hrh isolator installed at boiler of 1x500mw unit sgtps mppgcl birsinghpur.
Procurement of graphite braided gasket for crh and hrh isolator installed at boiler of 1x500mw unit sgtps mppgcl birsinghpur.
Read moreModular replacement of boiler hot reheat coil assemblies 89 nos including hrh outlet header nipples with higher grade material for 210 mw bhel make boiler in unit iv of mtpsi_2 items
Modular replacement of boiler hot reheat coil assemblies 89 nos including&#x0d hrh outlet header nipples with higher grade material for 210 mw bhel&#x0d make boiler in unit iv of mtpsi_2 items
Read moreKtps-v-bm-service charges for safety valves online floating test with trevi test/valtest method of unit-9 boiler ktps-v stage-reg
Ktps-v-bm-service charges for safety valves online floating test with trevi test/valtest method of unit-9 boiler ktps-v stage-reg.
Read moreWork of seat cutting/ repair/ machining / material build in drum, ms line (super heater) and hrh and crh line safety valves installed at the boiler of unit-2 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia
Work of seat cutting/ repair/ machining / material build in drum, ms line (super heater) and hrh and crh line safety valves installed at the boiler of unit-2 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia
Read moreWork of seat cutting/ repair/ machining /material build in drum, ms line(super heater) and hrh and crh line safety valves installed at the boiler of unit-1 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia.
Work of seat cutting/ repair/ machining /material build in drum, ms line(super heater) and hrh and crh line safety valves installed at the boiler of unit-1 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia.
Read moreKtps-v stage -bm-service charges for safety valves online floating test with trevi test/valtest method of unit-09 boiler ktps-v stage-reg
Ktps-v stage- bm- service charges for safety valves online floating test with trevi test valtest method of unit-9 boiler ktps-v stage.-reg
Read moreWork of seat cutting/ repair/machining/material build in drum,ms line (super heater) and hrh and crh line safety valves installed at the boiler of unit 1 and 2 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia.
Work of seat cutting/ repair/ machining / material build in drum, ms line (super heater) and hrh and crh line safety valves installed at the boiler of unit-1 and 2 at 2x600 mw units, sstpp,stage-i, mppgcl, dongalia.
Read moreThermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 dpps during overhauling period.
Thermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 dpps during overhauling period.
Read moreof your Industry type