Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of Face Pump And Laying Of Pipe Line For Dewatering. Of Working Faces And Shifting Of Auxiliary Fan With Air Duct In 39 Dip And 24 Ls Panel Of Seam C At Kurja Ug Mine Of Hasdeo Area For Eight Month Period.
|
Description |
Shifting Of Face Pump And Laying Of Pipe Line For Dewatering. Of Working Faces And Shifting Of Auxiliary Fan With Air Duct In 39 Dip And 24 Ls Panel Of Seam C At Kurja Ug Mine Of Hasdeo Area For Eight Month Period.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_326845_1 |
Reference Number |
AGM/HSD/SO(M)/e-Tend/24-25/125 dtd 27.01.2025 |
Tender Fee | 0 |
EMD | 1.23 Lakh |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338782 |
Start Date | January 27, 2025 23:30 |
End Date |
15/02/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreProviding and laying of g.i. pipe line, electrical works and dewatering pump for new swimming pool in
Providing and laying of g.i. pipe line, electrical works and dewatering pump for new swimming pool in 
 nfl, township bathinda
Read moreConstruction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug
Construction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreConstruction of 12 nos of isolation stopping for finally seal of proposed depillaring working panel vibe 12 of burhar vi seam at damini ug mine
Construction of 12 nos of isolation stopping for finally
 seal of proposed depillaring working panel vibe 12 of
 burhar vi seam at damini ug mine
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreReplacing of damaged 2nd drum pontoon of jarlahi patch sump and installation and commissioning of 2nd 4000gpm pump motor on the pontoon and di and erection of its pipe line for fast dewatering of mine water of phularitand, amp colliery.
Replacing of damaged 2nd drum pontoon of jarlahi patch sump and installation and commissioning of 2nd 4000gpm pump motor on the pontoon and di and erection of its pipe line for fast dewatering of mine water of phularitand, amp colliery.
Read moreConstruction of foundation/ plate from for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Construction of foundation/ platefrom for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Read moreTo assist contractually extension of 800mm belt, electrical shifting and laying of power cable in underground at lhd e8 proposed depillaring panel of bagdona coal seam at tawa mine of pathakhera area, wcl.
To assist contractually extension of 800mm belt, electrical shifting and laying of power cable in underground at lhd e8 proposed depillaring panel of bagdona coal seam at tawa mine of pathakhera area, wcl.
Read moreShifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Read moreof your Industry type