Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of Face Pump And Laying Of Pipe Line For Dewatering Of Working Faces In 34 Ln Panel Of Seam A At Kurja Ug Mine Of Hasdeo Area For Six Month Period.
|
Description |
Shifting Of Face Pump And Laying Of Pipe Line For Dewatering Of Working Faces In 34 Ln Panel Of Seam A At Kurja Ug Mine Of Hasdeo Area For Six Month Period.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_331613_1 |
Reference Number |
AGM/HSD/SO(M)/e-Tend/24-25/162 dtd 07.03.2025 |
Tender Fee | 0 |
EMD | 32100 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343757 |
Start Date | March 07, 2025 23:30 |
End Date |
19/03/2025 ( Expired 55 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Proposal for providing, laying, jointing and commissioning of hdpe pipe line in village mayla for improvement of water supply of tailend area under summer contigency 2025, sub div dhannasar(oandm), under division karamsana
Proposal for providing, laying, jointing and commissioning of hdpe pipe line in village mayla for improvement of water supply of tailend area under summer contigency 2025, sub div dhannasar(oandm), under division karamsana
Read moreFabrication of pontoon and pump shed and repairing of pontoon work for the purpose of dewatering and fire fighting operations as per requirement on the instruction of engineer-in-charge for a period of one year at kaniha ocp, kaniha area.
Fabrication of pontoon and pump shed and repairing of pontoon work for the purpose of dewatering and fire fighting operations as per requirement on the instruction of engineer-in-charge for a period of one year at kaniha ocp, kaniha area.
Read moreThe work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
Read moreLaying of 8 pipe line from 3p pump to discharge point near kps road tanker point in r/o sdocm project of dhori area against approved monsoon activity 2025
Laying of 8 pipe line from 3p pump to discharge point near kps road tanker point in r/o sdocm project of dhori area against approved monsoon activity 2025
Read moreJob required for repair replacement 150 mm dia pipe line at kabul line pump house and repair replacement to existing distribution system at age (u) water supply installation in the area of in the area of age (u) water supply no ii under ge (u) water
Job required for repair replacement 150 mm dia pipe line at kabul line pump house and repair replacement to existing distribution system at age (u) water supply installation in the area of in the area of age (u) water supply no ii under ge (u) water
Read moreProviding new borewell, pumpwith panel board, cable, gi pipe and specials, construction of new pump room, laying of pumping main pipe line at pillaipakkam village (source iii) of pillaipakkam panchayat in sriperumbudur panchayat union.
Providing new borewell, pumpwith panel board, cable, gi pipe and specials, construction of new pump room, laying of pumping main pipe line at pillaipakkam village (source iii) of pillaipakkam panchayat in sriperumbudur panchayat union.
Read moreProcurement of spares for mine line make electrical switchgear working in different ug and oc mines, workshops, chps and civil engg. departments on rate contract for a period of 2 years.
Procurement of spares for mine line make electrical switchgear working in different ug and oc mines, workshops, chps and civil engg. departments on rate contract for a period of 2 years.
Read moreSinking of 150mm x 80 mm dia tube well with installation of solar submersible pump for drinking pose including laying pipe line at jagannathpur within chubka gp under jhargram block in the district of jhargram
Sinking of 150mm x 80 mm dia tube well with installation of solar submersible pump for drinking pose including laying pipe line at jagannathpur within chubka gp under jhargram block in the district of jhargram
Read moreInstallation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreContractual work of 3nos sub-station installation and cable laying in w7b panel in ug at chhatarpur mine no. 1 of pathakhera area.
Contractual work of 3nos sub-station installation and cable laying in w7b panel in ug at chhatarpur mine no. 1 of pathakhera area.
Read moreof your Industry type