Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Drilling Of 06 Nos Nx Size Upward Vertical Borehole In Proposed Depillaring Panel 28 Ls And 24 Ls From Seam C To Seam A At Kurja Sheetaldhara Ug Mine Of Hasdeo Area For Six Month Time Period
|
| Description |
Drilling Of 06 Nos Nx Size Upward Vertical Borehole In Proposed Depillaring Panel 28 Ls And 24 Ls From Seam C To Seam A At Kurja Sheetaldhara Ug Mine Of Hasdeo Area For Six Month Time Period
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_318063_1 |
|
Reference Number |
AGM/HSD/GM(O)/e-Tend/24-25/95 dtd 24.09.2024 |
| Tender Fee | 0 |
| EMD | 25100 |
| Tender Value | - |
| Place | SECL Hasdeo Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329677 |
| Start Date | September 24, 2024 23:30 |
| End Date |
Expired
07/10/2024
Expired 736 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreConstruction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Read moreDrilling of 06 nos nx size upward vertical borehole in proposed depillaring panel 28ls, 24ls from seam c to seam a at kurja sheetaldhara ug mine of hasdeo area for six month time period
Drilling of 06 nos nx size upward vertical borehole in proposed depillaring panel 28ls, 24ls from seam c to seam a at kurja sheetaldhara ug mine of hasdeo area for six month time period
Read morePreparation of marching route of proposed lhcm depillaring panel 28ls and 24ls in seam c at kurja ug mine.
Preparation of marching route of proposed lhcm depillaring panel 28ls and 24ls in seam c at kurja ug mine.
Read moreConstruction of 37 nos of pcc ventilation stoppings in proposed lhcm depillaring panel 28ls and 24ls in seam c at kurja ug mine of hasdeo area
Construction of 37 nos of pcc ventilation stoppings in proposed lhcm depillaring panel 28ls and 24ls in seam c at kurja ug mine of hasdeo area
Read moreConstruction of subsidence pillars over proposed dep. panel -39dip, 28ls and 24ls of seam c at kurja ug mine.
Construction of subsidence pillars over proposed dep. panel -39dip, 28ls and 24ls of seam c at kurja ug mine.
Read morePreparation of belt roadway, haulage roadway and roadway of 28ls lhcm panel in seam cat kurja sheetaldhara ug mine
Preparation of belt roadway, haulage roadway and roadway of 28ls lhcm panel in seam cat kurja sheetaldhara ug mine
Read moreConstruction of 33 nos. of 50cm thick isolation stopping to isolate -39 dip, 28ls and 24ls proposed lhcm panel in seam c at kurja ug mine of hasdeo area.
Construction of 33 nos. of 50cm thick isolation stopping to isolate -39 dip, 28ls and 24ls proposed lhcm panel in seam c at kurja ug mine of hasdeo area.
Read moreDrilling of 06 nos borehole to dewater seam a and c for depillaring panel of seam c laying below seam a at kurja ug mine of hasdeo area for three month time period.
Drilling of 06 nos borehole to dewater seam a and c for depillaring panel of seam c laying below seam a at kurja ug mine of hasdeo area for three month time period.
Read moreof your Industry type