Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out The Detailed Survey For Construction Of Bridges And K.T.Weir On Painganga River Of Pentakli Project Tah. Mehkar.
|
| Description |
Carrying Out The Detailed Survey For Construction Of Bridges And K.T.Weir On Painganga River Of Pentakli Project Tah. Mehkar
|
| Organisation | CE(SP)-Water Resources Dept. Amravati | State Govt. and UT |
| Tender Id | 2024_CESWR_1034635_9 |
|
Reference Number |
VIDC/BIPC/Khadakpurna Project/T-Notice-07/2023-24 |
| Tender Fee | 2360 |
| EMD | 16500 |
| Tender Value | - |
| Place | Fardapur, Bramhapuri Tq.Mehkar |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1809073 |
| Start Date | March 14, 2024 15:30 |
| End Date |
Expired
28/03/2024
Expired 932 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out survey investigation and design of proposed tunnel and aqueducts on chankapur right canal and chankapur right bank extended canal under nar par girna river link project
Carrying out survey investigation and design of proposed tunnel and aqueducts on chankapur right canal and chankapur right bank extended canal under nar par girna river link project
Read moreCarrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Read moreConsultancy services for detailed survey,investigation,preparation of designs, drawings, estimates, dpr, package estimate, dtp and necessary diversion weir to river & necessary la proposals for byranapada lift irrigation scheme for providing irrigation facility to suffering atchkat of mbc by lifting water from tunga-bhadra river near govinahalu village & filling up of 6nos existing mi/zp/agr/wrd tanks in hariharataluk,davanagere dist &preparation of bid documents for implementation of the projec
Consultancy services for detailed survey,investigation,preparation of designs, drawings, estimates, detailed project report, package estimate, dtp and necessary diversion weir to river and necessary land acquisition proposals for byranapada lift irrigation scheme for providing irrigation facility to suffering atchkat of malebennuru branch canal by lifting water from tunga-bhadra river near govinahalu village & filling up of 6nos existing mi/zp/agr/wrd tanks in hariharataluk,davanagere dist, and preparation of bid documents for implementation of the project including providing required number of hard and soft copies
Read moreRemoval of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of painganga river at takarkhed ta mehkar dist buldhana
Removal of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of painganga river at takarkhed ta mehkar dist buldhana
Read moreRemoval of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of painganga river at bramhapuri ta mehkar dist buldhana
Removal of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of painganga river at bramhapuri ta mehkar dist buldhana
Read moreRemoval of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of painganga river at bramhapuri ta mehkar dist buldhana
Removal of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of painganga river at bramhapuri ta mehkar dist buldhana
Read moreDetailed grid line survey carrying out detailed survey along proposed gas pipeline routes for a wid
Read more
Carrying out detailed survey of existing dam cross section
Carrying out detailed survey of existing dam cross section and l section taking trial bores and investigation and testing of trial bore samples from designated labouratory and submit report to central water and power research centre pune cwprs pune f
Read moreof your Industry type