Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out Final Location Survey, Geotechnical Studies, Design, Preparation Of Drawings & Other Preliminary Activities For Preparing Detailed Estimate On Actual Realistic Cost In Connection With New Line Between Anupgarh To Bikaner (131.750km) And Spur Line From Rojhri To Khajuwala (54.875 Km) Of Bikaner Division Of North Western Railway.
|
| Description |
Carrying Out Final Location Survey, Geotechnical Studies, Design, Preparation Of Drawings & Other Preliminary Activities For Preparing Detailed Estimate On Actual Realistic Cost In Connection With New Line Between Anupgarh To Bikaner (131.750km) And Spur Line From Rojhri To Khajuwala (54.875 Km) Of Bikaner Division Of North Western Railway.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 06, 2026 18:58 |
| End Date |
Open
30/10/2026
15 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje
Rate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje
Read moreConducting final location survey, traffic survey with eirr/firr, preparation of lop for engineering / electrical / s&t works, esp, l-section, general arrangement drawings of bridges / rub/rob, preparation of detailed project report (dpr), epc/boq tender document and other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new koderma ror bypass bg line (08km),jamuniatand ror (06 km) and koderma bye-pass by creating y - connection between pi
For complete deion and other details, please refer to tender
Read moreof your Industry type