Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Intermediate Span ( 5.5 M Carriageway With Footpath On Both Sides) Motorable Bridge Over River Jehlum At Mehrajpora Sopore District Baramulla (Balance Work) (Complete Job) On Epc Mode (Engineering Procuremen And
|
| Description |
Design And Construction Of Intermediate Span ( 5.5 M Carriageway With Footpath On Both Sides) Motorable Bridge Over River Jehlum At Mehrajpora Sopore District Baramulla (Balance Work) (Complete Job) On Epc Mode (Engineering Procuremen And
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PWDJK_215861_1 |
|
Reference Number |
Fresh NIT No 31 /2023-24/RnB/SOPORE |
| Tender Fee | 11000 |
| EMD | 31.24 Lakh |
| Tender Value | 0 |
| Place | PWD (RNB) Rajabgh Srinagar |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | June 14, 2023 14:30 |
| End Date |
Expired
17/07/2023
Expired 1152 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design and construction of intermediate span ( 5.5m carriageway with footpath on both sides) motorable bridge over river jehlum at mehrajpora sopore district baramulla (balance work) (complete job) on epc mode (engineering procuremen and
Design and construction of intermediate span ( 5.5m carriageway with footpath on both sides) motorable bridge over river jehlum at mehrajpora sopore district baramulla (balance work) (complete job) on epc mode (engineering procuremen and
Read moreDesign and construction of bridge over river jehlum at mehrajpora sopore district baramulla (balance work) (complete job) on epc mode (engineering procuremen and construction mode)
Design and construction of bridge over river jehlum at mehrajpora sopore district baramulla (balance work) (complete job) on epc mode (engineering procuremen and construction mode)
Read moreConstruction of bridge over river jehlum at mehrajpora sopore (balance work)
Construction of bridge over river jehlum at mehrajpora sopore (balance work)
Read moreConstruction of bridge over river jehlum at mehrajpora sopore (balance work)
Construction of bridge over river jehlum at mehrajpora sopore (balance work)
Read moreConstruction of bridge over river jehlum at mehrajpora sopore (balance work)
Construction of bridge over river jehlum at mehrajpora sopore (balance work)
Read moreFencing/ dev of park at ward no. 6 on bank of jehlum at takisultan drangbal panchayat halqa drangbal block baramulla under adp (bdc)
Fencing/ dev of park at ward no. 6 on bank of jehlum at takisultan drangbal panchayat halqa drangbal block baramulla under adp (bdc)
Read moreCreation of 100kva sub-station for electric vehicle charging station at iocl retail outlet m/s kashmir forest coporation petrol pump at kupwara road sopore baramulla on essential feeder
Creation of 100kva sub-station for electric vehicle charging station at iocl retail outlet m/s kashmir forest coporation petrol pump at kupwara road sopore baramulla on essential feeder
Read moreDesign and construction of intermediate lane 150m long 3 x50m or any economical arrangement truss girder bridge (intermediate lane) over river jhelum at gurseer jagir sopore with foot-paths of 1.25 m width on both sides of bridge including drawings/d
Design and construction of intermediate lane 150m long 3 x50m or any economical arrangement truss girder bridge (intermediate lane) over river jhelum at gurseer jagir sopore with foot-paths of 1.25 m width on both sides of bridge including drawings/d
Read moreDesign and construction of 70mtr. span (2x35) single lane (4.25 mtr. carriageway) steel trussed motorable bridge with 1.2 mtr wide foot path on either side along with approaches by way of earthwork in cutting/filling construction of 04 no. 1 mtr. dia
Design and construction of 70mtr. span (2x35) single lane (4.25 mtr. carriageway) steel trussed motorable bridge with 1.2 mtr wide foot path on either side along with approaches by way of earthwork in cutting/filling construction of 04 no. 1 mtr. dia
Read moreDesign and construction of 70mtr. span (2x35) single lane (4.25 mtr. carriageway) steel trussed motorable bridge with 1.2 mtr wide foot path on either side along with approaches by way of earthwork in cutting/filling construction of 04 no. 1 mtr. dia
Design and construction of 70mtr. span (2x35) single lane (4.25 mtr. carriageway) steel trussed motorable bridge with 1.2 mtr wide foot path on either side along with approaches by way of earthwork in cutting/filling construction of 04 no. 1 mtr. dia
Read moreof your Industry type