Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Balance Work Animal Birth Control Centre Konchha Bhanwar, Jhansi (U.P.)
|
Description |
Construction Of Balance Work Animal Birth Control Centre Konchha Bhanwar, Jhansi (U.P.)
|
Organisation | Construction and Design Services UP Jal Nigam | State Govt. and UT |
Tender Id | 2025_UPCDS_1002802_1 |
Reference Number |
176/ M-10/36 Dated 05/02/2025 |
Tender Fee | 5900 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Jhansi |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1789171 |
Start Date | February 06, 2025 14:30 |
End Date |
12/02/2025 ( Expired 105 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 33 kv line from 33/11 kv medical sub-station to proposed 33/11 kv sub-station at bhumi vikas evam grih sansthan yojna no.-3, jhansi
Construction of 33 kv line from 33/11 kv medical sub-station to proposed 33/11 kv sub-station at bhumi vikas evam grih sansthan yojna no.-3, jhansi
Read moreBalance work for development of green space work at porsa town district morena under amrut 2.0 scheme
Balance work for development of green space work at porsa town district morena under amrut 2.0 scheme
Read moreConstruction of, main gate, installation of paver block drilling tubewell work at mcp pipla narayanwar, m.r.f. center at gangatwara susar pandhurna main road, under sbm-2
Construction of, main gate, installation of paver block drilling tubewell work at mcp pipla narayanwar, m.r.f. center at gangatwara susar pandhurna main road, under sbm-2
Read moreItem-1 remaining work for construction of mig-a-45 nos. (8.00 x 15.00) mtr. houses, for board employee scheme, sector-6, barli, jodhpur
Remaining work for construction of mig-a-45 nos. (8.00 x 15.00) mtr. houses, for board employee scheme, sector-6, barli, jodhpur
Read moreBalance work for improvement renovation to mayabati mip in patnagarh block of balangir district under oiipcra package id bgr 8 of one minor irrigation project
Balance work for improvement renovation to mayabati mip in patnagarh block of balangir district under oiipcra package id bgr 8 of one minor irrigation project
Read moreof your Industry type