Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Upgradation Between Km 29.725 To Km 60.550 Suraithota Malari On Joshimath Malari Road On Epc Mode Nh 107 B In The State Of Uttarakhand
|
| Description |
Rehabilitation And Upgradation Between Km 29.725 To Km 60.550 Suraithota Malari On Joshimath Malari Road On Epc Mode Nh 107 B In The State Of Uttarakhand Length 30.825 Km
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2022_BRO_562362_1 |
|
Reference Number |
Chardham/Shivalik/08/2022-23 |
| Tender Fee | 20000 |
| EMD | 1.91 Crore |
| Tender Value | - |
| Place | HQ CE (P) Shivalik, IDPL Complex, Rishikesh |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | December 09, 2022 22:30 |
| End Date |
Expired
26/06/2023
Expired 1208 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreTreatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreRehabilitation and upgradation of exist 2l to 4l of nh146 from km 0.000 km 158.600 near berkheri vill to km 23.423 km 181.800 near lehdara vill in the state of madhya pradesh on epc mode tl 23.423 km
Rehabilitation and upgradation of exist 2l to 4l of nh146 from km 0.000 km 158.600 near berkheri vill to km 23.423 km 181.800 near lehdara vill in the state of madhya pradesh on epc mode tl 23.423 km
Read moreHt line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Ht line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from km. 0.000 to km. 51.600 of nh321g (agra (junction on nh509 at tedhi baghia) to nuhkhas) to 2 lane with ps configuration in the state of uttar pradesh on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from km. 0.000 to km. 51.600 of nh321g (agra (junction on nh509 at tedhi baghia) to nuhkhas) to 2 lane with ps configuration in the state of uttar pradesh on epc mode.
Read moreRehab and upgradation of existing road bet km 29.725 to km 60.550 suraithota to malari nhsl to double lane specification of joshimath malari (nh-107b) road on epc mode in the state of uttarakhand
Rehab and upgradation of existing road bet km 29.725 to km 60.550 suraithota to malari nhsl to double lane specification of joshimath malari (nh-107b) road on epc mode in the state of uttarakhand
Read moreConsultancy services for authoritys engineer for supervision of upgradation to 2 lane with hard shoulder configuration of suraithota ch 29.725 km to malari ch 60.550 km road on nh 107b under bharatmala pariyojana on epc mode in the state of utta
Consultancy services for authoritys engineer for supervision of upgradation to 2 lane with hard shoulder configuration of suraithota ch 29.725 km to malari ch 60.550 km road on nh 107b under bharatmala pariyojana on epc mode in the state of utta
Read moreSlope protection at subhaigadhera nalla site at existing chainage km 20.05 on joshimath malari road nh 107b through epc mode in the state of uttarakhand
Slope protection at subhaigadhera nalla site at existing chainage km 20.05 on joshimath malari road nh 107b through epc mode in the state of uttarakhand
Read moreSlope protection at subhaigadhera nalla site at existing chainage km 20.05 on joshimath malari road nh 107b through epc mode in the state of uttarakhand
Slope protection at subhaigadhera nalla site at existing chainage km 20.05 on joshimath malari road nh 107b through epc mode in the state of uttarakhand
Read moreof your Industry type