Tender Details

Particulars Details
Title
Extension Of Common Loop Line In Pnbe/End At Parsa Bazar Station In Pnbe Gaya Section &Amp Extension Of Dn Loop Line In Pnbe/End At Parsa Bazar Station In Pnbe Gaya Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 83576579
Reference
Number
W7ETENDER13OPENDNR25-26-9
Tender Fee 0
EMD 3.83 Lakh
Tender Value -
Place Hazipur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83576579/viewNitPdf_5072102.pdf

Start Date August 09, 2025 11:23
End Date
Expired 01/09/2025

Expired 409 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Replacement of worn out girders of common loop line & up third loop line and replacement of wornout girders of up & dn gc main line gaya bridge along with replacement of bearing plate & fitting of up & dn gc girder of gaya bridge at dhn.

Replacement of worn out girders of common loop line & up third loop line and replacement of wornout girders of up & dn gc main line gaya bridge along with replacement of bearing plate & fitting of up & dn gc girder of gaya bridge at dhn.

Read more
Provision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility

Provision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility

Read more
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division

Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division

Read more
Construction of fob in connection with the work extension of all lines with provision of pqrs line beside dn loop line and provision of up passenger platfrom at ondagram station.

Construction of fob in connection with the work extension of all lines with provision of pqrs line beside dn loop line and provision of up passenger platfrom at ondagram station.

Read more
Biometric attendance machine,6 core optical fiber cable,16 port gigabit network switch,gigabit media converter,5 port gigabit desktop switch,desktop computer,optical fiber junction box,fiber optic patch cord,fiber joint splicing 6 core,waterproof poe box,cat 6 cable,16 port 15 amp main power extension board,3 port power cord,flexible pipe 1 inch,flexible pipe 2 inch,2 core 1.5mm power cable,insulation tape,cable tie 500nos per pkt,black machine screw 2 inch,plastic gitti 1.5 inch,10mm clamp,rj45 connector,laying of 12 km optical fiber cable,laying of 800 mtr power cable,installation of electrical point at far end,main electrical point with multiple outlets,installation of 12 biometric machine,configuration integration testing and commissioning of complete system

Biometric attendance machine,6 core optical fiber cable,16 port gigabit network switch,gigabit media converter,5 port gigabit desktop switch,desktop computer,optical fiber junction box,fiber optic patch cord,fiber joint splicing 6 core,waterproof poe box,cat 6 cable,16 port 15 amp main power extension board,3 port power cord,flexible pipe 1 inch,flexible pipe 2 inch,2 core 1.5mm power cable,insulation tape,cable tie 500nos per pkt,black machine screw 2 inch,plastic gitti 1.5 inch,10mm clamp,rj45 connector,laying of 12 km optical fiber cable,laying of 800 mtr power cable,installation of electrical point at far end,main electrical point with multiple outlets,installation of 12 biometric machine,configuration integration testing and commissioning of complete system

Read more
Click Here to Download Dockets