Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Worn Out Girders Of Common Loop Line & Up Third Loop Line And Replacement Of Wornout Girders Of Up & Dn Gc Main Line Gaya Bridge Along With Replacement Of Bearing Plate & Fitting Of Up & Dn Gc Girder Of Gaya Bridge At Dhn.
|
| Description |
Replacement Of Worn Out Girders Of Common Loop Line & Up Third Loop Line And Replacement Of Wornout Girders Of Up & Dn Gc Main Line Gaya Bridge Along With Replacement Of Bearing Plate & Fitting Of Up & Dn Gc Girder Of Gaya Bridge At Dhn.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 22, 2026 23:51 |
| End Date |
Closing soon
15/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of bridge girder including bearing in br. no 18a rob (1x12.2m) b/w crp-dgd under sse/br/dhn.
Replacement of bridge girder including bearing in br. no 18a rob (1x12.2m) b/w crp-dgd under sse/br/dhn.
Read moreGandhidham - new bhuj - naliya section - ohe modification work in connection to lc elimination and bridge rebuilding & girder replacement work
Gandhidham - new bhuj - naliya section - ohe modification work in connection to lc elimination and bridge rebuilding & girder replacement work
Read moreExecution of p way work and construction of bridge in connection with the work of dismantling of up and dn main line cross over at both ends to eliminate dn main cum up loop facility by provision of up loop line and island passenger platform at garbeta (gba) station.
Execution of p way work and construction of bridge in connection with the work of dismantling of up and dn main line cross over at both ends to eliminate dn main cum up loop facility by provision of up loop line and island passenger platform at garbeta (gba) station.
Read moreOpen tender for replacement of existing sleeper by h-beam sleeper of bridge no. 656, 691 and others and replacement of fittings of girder bridges under the jurisdiction of sr.den/2/asn.
Open tender for replacement of existing sleeper by h-beam sleeper of bridge no. 656, 691 and others and replacement of fittings of girder bridges under the jurisdiction of sr.den/2/asn.
Read moreInspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Read moreShifting of departmental pipe line and replacement of air valve near lalgarh railway over bridge under phed pdr sub dn ist bikaner
Shifting of departmental pipe line and replacement of air valve near lalgarh railway over bridge under phed pdr sub dn ist bikaner
Read moreOhe modification work in connection with replacement of steel girder by psc slab at bridge no. 31dn & 76dn and providing extra water way at bridge no. 60 under aden(vya) section in udn-jl section of mumbai division of western railway.
Ohe modification work in connection with replacement of steel girder by psc slab at bridge no. 31dn & 76dn and providing extra water way at bridge no. 60 under aden(vya) section in udn-jl section of mumbai division of western railway.
Read moreStrengthening of existing side pathway and replacement of corroded/perforated members like m.s chequered plate by ss antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of br. no.12 up, 20 up , 51 up, 83 up, 91 dn, 105 dn, 106 dn, 11 dn, 168 a, 169, 171, 171a, 173, 174a, 179, 180a, 215, 217 and 230 in bb loop and provision of new side pathway at br.nos 2,5,6 in nh-bdc section & tpkr fly over of howrah.
Strengthening of existing side pathway and replacement of corroded/perforated members like m.s chequered plate by ss antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of br. no.12 up, 20 up , 51 up, 83 up, 91 dn, 105 dn, 106 dn, 11 dn, 168 a, 169, 171, 171a, 173, 174a, 179, 180a, 215, 217 and 230 in bb loop and provision of new side pathway at br.nos 2,5,6 in nh-bdc section & tpkr fly over of howrah.
Read moreStrengthening of existing side pathway and replacement of corroded /perforated members like m.s chequered plates by ss antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of br. no.-12 up, 20 up, 51 a, 83 up, 91 dn , 105 dn, 106 dn, 119 dn, 168 a, 169 , 171,171a, 173, 174 a, 179, 180 a ,215, 217 and 230 in bb loop and provision of new path at br. nos 2, 5, 6 in nh-bdc section & tpkr fly over of howrah division.
Strengthening of existing side pathway and replacement of corroded /perforated members like m.s chequered plates by ss antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of br. no.-12 up, 20 up, 51 a, 83 up, 91 dn , 105 dn, 106 dn, 119 dn, 168 a, 169 , 171,171a, 173, 174 a, 179, 180 a ,215, 217 and 230 in bb loop and provision of new path at br. nos 2, 5, 6 in nh-bdc section & tpkr fly over of howrah division.
Read moreS&t work in c/w (1) repl. of steel girder with rcc slab of bridge no.102 up&dn, 111 up&dn, 119 up on juc-asr sec., b.no.180 on asr-att & br. no.103 on vka-dbnk section. (ii) construction of lhs of internal size 5 m x 3.5 m lhs in lieu of lc c-7 at km 4/13-14 on juc-nro section under aden-juc over firozpur division. (iii) construction of lhs of internal size 5.0 x 5.0m at manned l-xings no.a-5 on vka-dbnk section by pushing method in the section under aden-i/asr. (iv) constructi
S&t work in c/w (1) repl. of steel girder with rcc slab of bridge no.102 up&dn, 111 up&dn, 119 up on juc-asr sec., b.no.180 on asr-att & br. no.103 on vka-dbnk section. (ii) construction of lhs of internal size 5 m x 3.5 m lhs in lieu of lc c-7 at km 4/13-14 on juc-nro section under aden-juc over firozpur division. (iii) construction of lhs of internal size 5.0 x 5.0m at manned l-xings no.a-5 on vka-dbnk section by pushing method in the section under aden-i/asr. (iv) constructi
Read moreof your Industry type