Tender Details
Particulars | Details |
---|---|
Title |
Sr To Gm Road To Barawa Vidhyapati Link Road Year 2023 24 Lot No 4 Of 10
|
Description |
Sr To Gm Road To Barawa Vidhyapati Link Road Year 2023 24 Lot No 4 Of 10
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_CEGKP_862243_4 |
Reference Number |
8109/33Com-Gkp Circle/2023 Dated 03-11-2023 |
Tender Fee | 2714 |
EMD | 4 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://etender.up.nic.in |
Start Date | November 16, 2023 14:30 |
End Date |
30/11/2023 ( Expired 536 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of cc top layer frm sapna singh house to bichchna road kusum house to lala house chaitu kol house to sbi bank jyoti singh house to munni house, samresh house to santosh jarha shop, behind gm bungle to pani tanki, around krishna colony at
Construction of cc top layer frm sapna singh house to bichchna road kusum house to lala house chaitu kol house to sbi bank jyoti singh house to munni house, samresh house to santosh jarha shop, behind gm bungle to pani tanki, around krishnacolony wn3
Read moreSupply and installation of porcupines for additional high priority works in lakhimpur (dhakuwakhana, bonpuroi), biswanath and sonitpur districts package no. g-24. lot 3
Supply and installation of porcupines for additional high priority works in lakhimpur (dhakuwakhana, bonpuroi), biswanath and sonitpur districts package no. g-24, lot 3
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreSpecial repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) meerut cantt
Special repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) 
 meerut cantt
Read moreCc road and drain contruction from champalal rajak to girraj kushah, from shop of sunil maharaj to munna kushwah lamberdar in ward no 15 at nagar parisad badarwas district shivpuri
Cc road and drain contruction from champalal rajak to girraj kushah, from shop of sunil maharaj to munna kushwah lamberdar in ward no 15 at nagar parisad badarwas district shivpuri
Read moreof your Industry type